Laserfiche WebLink
<br />Deere & Ault Consultants, Inc. - Dam & Reservoir Projects <br /> <br />Page 5 of 8; <br /> <br />~";. <br /> <br />borrow soils. <br /> <br />A list of our projects currently In design or construction are: <br /> <br />· Shores Reserv.oirs A, B, C, and D <br />· Heit Pit <br />· Nissen Pit <br />· Bernhardt Reservoirs <br />· Walker Reservoir <br />· Stagecoach Reservoir <br />· Stagecoach North <br />· Fort Lupton Reservoir <br />· HiII-Eber-Oakley Pit <br />· Golden Pit Reservoir <br /> <br />Dunes Reservoir <br />Brighton, Colorado <br /> <br /> <br /> <br />Riprap slope protection and riprap bedding <br />placement along upstream face of dam <br />embankment <br /> <br />Earthen dam construction activities, building <br />upward from reservoir bottom. <br /> <br />The Dunes Reservoir is a 5,200 acre-foot project located northwest of Denver, Colorado. The <br />project includes one million cubic yards of earth dam construction, a concrete emergency spillway, <br />and a 48-inch diameter ou~let pipe. Deere and Ault Consultants, Inc. (D&A) provided final design <br />services and construction engineering for the project. <br /> <br />The water storage Jeservoir will be owned by the Denver Water Board and South Adams County <br />Water and Sanitation District. Project challenges include coordination between embankment dam <br />construction and on-going mining activities, special design consideration and design amendments <br />during construction were required to use available on-site borrow materials for embankment dam <br />fill, and coordination to accommodate an existing large capacity canal running parallel to the <br />downstream toe of the dam. <br /> <br />Client: Dunes Investment Partners, LLC Denver Water <br />Project Cost: $8 million <br /> <br />Fort Lupton Pit, Golden Site and Hill/Eber/Oakley Site <br />Fort Lupton, Colorado <br /> <br />file://X:\0290 Delta Sand & Gravel\04-0020 Pit Rxn~n~1()n\Hvr1nl~11(,. "R~rr1pr\npprp ~r A,d <br /> <br />11/1/'1()()t::. <br />