My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A: Public Hearing onMetro Plan Amendment (Delta Sand and Gravel)
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 12/12/06 Joint Public Hearing
>
Item A: Public Hearing onMetro Plan Amendment (Delta Sand and Gravel)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:58:15 PM
Creation date
12/7/2006 11:34:08 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
12/12/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Deere, & Ault Consultants, Inc. - Dam & Reservoir Projects <br /> <br />Page.70f8 <br /> <br />" <br /> <br />~, <br /> <br />Client: Lafarge West, Inc. <br />Project Cost: $1 million <br /> <br />The Shores <br />Longmont, Colorado <br /> <br /> <br />Soil-bentonite slurry wall reservoir liner system under construction. <br /> <br />The Shores Reservoirs are below grade, lined, water storage reservoirs constructed in conjunction <br />with aggregate mining activities. The site is located near the St. Vrain River in Weld County, <br />Colorado. Reservoir liners include compacted earthen embankment slope liners and soil-bentonite <br />slurry wall lining systems. In total, over 25,000 linear feet of liner will be constructed. Design <br />challenges include coordinating the reservoir construction with existing irrigation ditch facilities. <br />Eight existing ditches and irrigation laterals crossed the property. Relocation of ditch diversion <br />structures, design and construction of new laterals and diversions to fill the ponds, and <br />configuration of the reservoir layouts required careful consideration and coordination with ditch <br />company boards and individual lateral owners. <br /> <br />Federal permits, including U.S. Army Corps of Engineers' 404 permits were required. New diversions <br />to fill the reservoirs and interconnecting pipeline tunnels between the reservoirs were designed. <br /> <br />Final reservoir storage along with the filling and interconnect facilities will be owned by Central <br />Colorado Water Conservancy District. The projected total water storage volume will be <br />approximately 4,800 acre-feet <br /> <br />Client: Lot Holding, LLC <br />Project Cost: $2 million <br /> <br />Siebring Reservoir <br />Greeley, Colorado <br /> <br /> <br />Siebring Reservoir was lined with a 10/000-foot long soil-bentonite slurry <br />wall converting a mined gravel pit into a raw water storage reservoir. <br /> <br />file://X:\0290 Delta Sand & GraveI\04-0020 Pit Exnanslon\Hvc1nl~11r H~rripr\npprp ~ Alll <br /> <br />1 l/l/')(\(\h <br />
The URL can be used to link to this page
Your browser does not support the video tag.