My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A: Public Hearing onMetro Plan Amendment (Delta Sand and Gravel)
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 12/12/06 Joint Public Hearing
>
Item A: Public Hearing onMetro Plan Amendment (Delta Sand and Gravel)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:58:15 PM
Creation date
12/7/2006 11:34:08 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
12/12/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Delta Sand & Gravel Mining Area Expansion Noise <br /> <br />According to Delta Sand & Gravel, the overburden material used to build the berms will not <br />be sold as resource material and it will be placed back over the trench area once the <br />aquaclude has been constructed inside the trench. Therefore, in the analysis, DSA considered <br />the noise generated during the construction of the berm would be exempt from the DEQ <br />noise regulation limits in accordance with OAR 340-035-0035 (5) (g) and (h). <br /> <br />To aid in conducting the noise analyses, DSA first determined that portion of the aquaclude <br />trench where excavation noise would exceed the DEQ noise regulation limits at a residence if <br />noise reduction berms were not constructed by Delta Sand & Gravel. Figure 1 shows that <br />portion of the aquaclude trench where the noise needs to be mitigated to ensure compliance <br />with the DEQ noise regulation assuming a CAT 980H front-end loader with a noise <br />suppression package or a CAT 330L excavator is used to excavate material below the <br />overburden for more than 30 minutes per hour. Figure 2 shows that portion of the aquaclude <br />trench where the noise needs to be mitigated to ensure compliance with the DEQ noise <br />regulation assuming the front-end loader or excavator operates less than 30 minutes per hour. <br /> <br />To further explain the two figures, Figure 1 identifies that portion of the aquaclude trench <br />located within 475 feet of a residence and Figure 2 identifies that portion of the aquaclude <br />trench located within 250 feet ofa residence. Four hundred seventy five (475) feet is the <br />setback distance from a residence needed to meet the ambient hourly LSD noise level plus 10 <br />dB limit found at residences along Admiral Lane if a CAT 980H front-end loader with a <br />noise suppression package or CAT 330L excavator operates more than 30 minutes per hour <br />without the presence of a noise reduction berm. Two hundred fifty (250) feet is the setback <br />distance required to not exceed the ambient hourly LIO noise level plus 10 dB limit found at <br />residences along Admiral Lane if the equipment operates less than 30 minutes per hour. The <br />setback distances are conservative because, as the trench excavation moves south along the <br />west property line, the ambient noise levels increase. Consequently, the noise limits are <br />higher at residences south of Admiral Lane and the setback distance could decrease. <br /> <br />As can be seen by comparing the informatiQQ in Figure 1 and Figure 2, the use of time limits <br />on the excavation work in the trench can actually be used as a noise mitigation measure <br />itself. If the excavation activity in the trench occurs during less than 30 minutes per hour, <br />then the need for further mitigation is significantly reduced due to the fact tpat the noise <br />limits specified in the DEQ noise regulation are time dependant. The less time the noise is <br />present, the louder the noise can be when it is present. <br /> <br />As can be seen in Figure 2, even after reducing the amount of time trench excavation work <br />occurs during an hour, there will be the need to provide some noise reduction measure to <br />ensure the excavation noise is in compliance with the DEQ noise limits at all residences. This <br />means that noise control berms will be needed at times during the excavation of the <br />aquaclude trench. Using the CAT 980H front-end loader sound data provided by the <br />manufacturer (72 dBA at 50 feet) and the CAT 330L excavator measured by DSA, it was <br />determined that when excavation work in the aquaclude trench occurs for more than 30 <br />minutes per hour, a nine foot high benn in the vicinity of the work area shown in Figure 1 <br />will be enough to ensure compliance with the DEQ noise regulations. If the excavation work <br /> <br />137045-M2.doc <br /> <br />October 27, 2006 <br /> <br />Page 2 of3 <br />