Laserfiche WebLink
Figure 8 <br />City of Eugene <br />June/July 2018 <br />Issues of Concern <br />(Front End of Mind) <br />Question 1.0: Is there a Local Issue you are especially concerned <br />abouttoday? <br />Question 1.1: Top four (4) issues of concern: <br />Note: <br />There has been a steady increase in concern for <br />the Norneless: <br />Avoid Cutbacks in City Services (2012) 7% <br />Eugene Library study (2015) 12% <br />G.O. Street Bond (2017) 37% <br />Public Safety (2018) 40% <br />'x <br />40% <br />Homeless <br />7% <br />Traffic Congestion <br />5% <br />Taxes <br />4% <br />Public Safety <br />Note: <br />There has been a steady increase in concern for <br />the Norneless: <br />Avoid Cutbacks in City Services (2012) 7% <br />Eugene Library study (2015) 12% <br />G.O. Street Bond (2017) 37% <br />Public Safety (2018) 40% <br />'x <br />