My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 9-10-18 Work Session
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2018
>
09-10-2018
>
Agenda Packet 9-10-18 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2018 1:26:29 PM
Creation date
9/14/2018 1:24:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> <br />Performance Measures <br /> <br />The adopted Eugene 2035 TSP contains performance measures that match that of TransPlan (the <br />Eugene-Springfield metropolitan area’s “Regional Transportation System Plan or “RTSP”). When the City <br />adopted the 2035 TSP, it needed performance measures in the TSP to closely match those in the RTSP. <br />However, the State is expected to soon eliminate the requirement that cities in metropolitan areas have <br />RTSPs. It is likely the State will require that cities adopt new performance measures by June 30, 2020, <br />designed to decrease greenhouse gas emissions from transportation. The anticipated change in State <br />regulations are in line with the City of Eugene’s goals and policies. <br /> <br />Once the State rules are adopted, the City of Eugene will develop performance measures to meet new <br />State Transportation Planning Rule requirements while better aligning performance measure <br />benchmarks with the Council’s adopted climate recovery and Vision Zero goals. The State will provide <br />three options for cities to demonstrate how they have planned for reducing greenhouse gas emissions <br />by increasing transportation choices and reducing reliance on the automobile. <br /> <br />In addition to meeting State requirements, the City will also monitor advancement toward achieving the <br />goals of the Eugene 2035 TSP and make progress reports available to the public. <br />September 10, 2018, Work Session - Item 2
The URL can be used to link to this page
Your browser does not support the video tag.