Laserfiche WebLink
<br /> <br />Jesse Brabham (A 18‐2) September 2018 Page 2  <br />Policy 15.    Ultimately, land within the UGB shall be annexed to a city and provided with  <br />the required minimum level of urban facilities and services. While the time frame for  <br />annexation may vary, annexation should occur as land transitions from urbanizable to  <br />urban. (page II‐C‐5)   <br />  <br />The following policy from the Residential Element of the Metro Plan is also applicable:  <br />  <br />Policy A.2   Residentially designated land within the UGB should be zoned consistent with  <br />the Metro Plan, and applicable plans and policies; however, existing agricultural zoning  <br />may be continued within the area between the city limits and UGB until rezoned for  <br />urban uses.  <br />  <br />The Metro Plan designates the annexation area as appropriate for residential use. The  <br />River Road ‐ Santa Clara Urban Facilities Plan (RR/SC UFP) is the adopted refinement plan  <br />for the subject property and also designates the area for residential uses. The property is  <br />currently zoned Low‐Density Residential with Urbanizable Land Overlay (R‐1/UL). The  <br />/UL overlay will be automatically removed from the zoning following annexation  <br />approval.   <br />  <br />With regard to applicable policies of the RR/SC UFP, the subject property is not located  <br />within any of the described subareas. Further, none of the general “Residential Land Use  <br />Policies” at Section 2.2 appear to be directly applicable to the subject request. The  <br />“Public Facilities and Services Element” policies of the RR/SC UFP are directed at local  <br />government; however, the premise of these policies (regarding the provision of urban  <br />services) is the assumption that the property within the UGB will be annexed.     <br />  <br />As previously discussed in this subsection, and further detailed under subsection (3)  <br />below, the proposed annexation is consistent with Metro Plan growth management  <br />policies and can be served by the minimum level of key urban services.  The annexation  <br />procedures beginning at EC 9.7800 are consistent with State law and therefore, as found  <br />throughout this report, the annexation is consistent with State law.  <br />  <br />Therefore, based on the findings above, the proposal is consistent with the applicable  <br />policies of the Metro Plan and applicable refinement plan.  <br />EC 9.7825(3)      The proposed annexation will result in a boundary in which the minimum level of key  <br />urban facilities and services, as defined in the Metro Plan, can be provided in an  <br />orderly, efficient, and timely manner.  <br />Complies Findings:  Consistent with this criterion, the proposed annexation will result in a  <br />boundary in which the minimum level of key urban facilities and services can be  <br />provided in an orderly, efficient, and timely manner as detailed below:  <br />  <br />Wastewater  <br />According to the as‐constructed drawings, an 8‐inch public wastewater line exists within  <br />Maclay Drive directly in front of the subject property, however, no connection record  <br />was found. As an informational item, there is an on hold wastewater assessment for this  <br />tax lot that will need to be paid prior to any development.  <br />YES  <br /> NO  <br />September 10, 2018, Meeting - Item 2C