My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 10-17-18 Work Session
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2018
>
10-17-2018
>
Agenda Packet 10-17-18 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2018 9:46:39 AM
Creation date
10/12/2018 9:39:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Reviews the applicant’s conformance with the Required Public Benefits and making recommendations regarding approval/denial of the tax exemption to the City Manager. <br />• Reviews the project’s conformance with approval requirements midway through construction, at completion of construction, and during the exemption period. <br />• Assists the City Manager in preparing an Annual Report on progress of the approved projects, program volume cap, and reporting documentation. The Review Panel consists of two at-large neighborhood representatives selected by neighborhood association boards, an additional two representatives selected by the board of the neighborhood association in which the proposed project is located, and six technical professionals selected by the City Manager from the following six groups: architects/green building specialists; building trades union; developers; environmental professionals; public health professionals; and human rights representatives. Prior Review Panel reports can be found at www.eugene-or.gov/MUPTE <br />MUPTE Boundary <br /> <br />October 17, 2018, Work Session – Item 2
The URL can be used to link to this page
Your browser does not support the video tag.