My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 11-13-18 Meeting - AMENDED
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2018
>
11-13-2018
>
Agenda Packet 11-13-18 Meeting - AMENDED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2018 9:33:58 AM
Creation date
11/16/2018 9:26:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary of Urban Service Provision <br />This form is intended as a guide to assist applicants in demonstrating that a minimum level of <br />key urban services can be provided to the area proposed for annexation. Space is provided on <br />this form for you to provide detailed information on service provision. Please add additional <br />pages if necessary to provide details of servicing issues related to the area you are annexing. To <br />assist you in providing this information, some contacts are listed below. For large or difficult to <br />serve properties, you may wish to contact a private land use planning consultant to prepare <br />your application. <br />Proper y <br />A rin vi and Am,] r, V 06; Owner(s) Name: <br />0 <br />Assessor's Map and Tax Lot Numbers for Properties Proposed for Annexation <br />For example: Map 17-03-19-31, Tax Lot 100) <br />11 r r. 'Tai l®t 4CO <br />Wastewater All new development must connect to the wastewater (sanitary sewer) system. <br />Is wastewater service available to serve the area proposed for annexation? (For more <br />information, contact the Engineering staff at the City of Eugene Permit and Information Center <br />or call 541-682-8400.) <br />The property(ies) in this annexation request: <br />V will be served from an existing gravity wastewater line. <br />Locati and si of exij, g wastew ter line: <br />will be s ed by an extension of an existing gravity wastewater line. <br />Where will a wastewater line be extended from? When will it be extended? By whom? <br />Stormwater Site plans for all new development must provide for drainage to an approved <br />system consistent with the Comprehensive Stormwater Management Plan. City approval for <br />storm drainage will be required as part of the development process. (For more information, <br />contact the Engineering staff at the City of Eugene Permit and Information Center or call 541- <br />682-8400.) <br />Is t1e site currentl served by an approved storrnwater , ystem?k;r-(v-yr C~ a r ' G{c'c tz3 1 t~, <br />Ae ross Fe Y G~(A[t a111 PTV V r5"November 13, 2018, Meeting – Item 3C
The URL can be used to link to this page
Your browser does not support the video tag.