Laserfiche WebLink
August 6, 2018 <br />4 ~CE ~IVdli <br />lip ? 2018 <br />CITY OF EUGENE <br />ANNEXATION APPLICATION <br />TM 17-04-13-32, TL 5200 <br />Branch Engineering Inc. Project No. 18-312 <br />Branch <br />EN"GINEERING.= <br />Since 1977 <br />All those lands conveyed in that Warranty Deed recorded on February 25, 2011 as <br />Document Number 2011-009423 in the Lane County Oregon Official Records, said lands <br />being more particularly described as follows: <br />COMMENCING at a 5/8-inch iron rod on the Easterly right-of-way line of River Road <br />206.38 feet South 16°47'45" East from a 5/8-inch iron rod marking the intersection of <br />the South right-of-way line of Owosso Drive, said South line being 25.0 feet South from <br />when measured at right angles) the center line of said Owosso Drive and the Easterly <br />right-of-way line of River Road, said Easterly right-of-way line being 50.0 feet Easterly <br />from (when measured at right angles;) the center line of said River Road, said beginning <br />point is also described as being North 89°53'50" East 52.20 feet from a point in Section <br />13, Township 17 South, Range 4 West of the Willamette Meridian, in the Center of the <br />County Road known as the River Road, at the Northwest corner of the lot or tract <br />conveyed to George W. and Lillith Leeper, by deed recorded in Book 122, Page 335, Lane <br />County Deed Records, said point being 10.446 chains South 17° East from an iron bar <br />set in County Survey No. 688 of the Recorded Surveys of said County, in the center of <br />said road, 42.72 chains East of the Northwest corner of County Survey No. 12, which is <br />7.30 chains North from the Southwest corner of the Joseph Davis and wife Donation <br />Land Claim No 48; <br />THENCE North 89°53'50" East 151.33 feet to a %2-inch iron rod and the TRUE POINT OF <br />BEGINNING of this tract; <br />THENCE North 0°19' East 196.19 feet to a %2-inch iron rod on <br />the South right-of-way line of Owosso Drive (50.0 feet <br />wide); <br />THENCE South 89°42' East along said Southerly right-of-way <br />line 254.79 feet to a %2-inch iron rod; <br />THENCE South 0°18' West 194.40 feet to a %2-inch iron rod; <br />THENCE South 89°53'50" West 254.80 feet to the TRUE <br />POINT OF BEGINNING, in Lane County, Oregon <br />REGISTERED <br />PROFESSIONAL <br />LAND SURVEYOR <br />OREGON <br />MAY 12, 2011 <br />DANIEL ADAM NELSON <br />84832LS <br />RENEWAL DATE: 12/31/18 <br />EUGENE-SPRINGFIELD <br />310 511 Street, Springfield, OR 97477 I p: 541.746.0637Iwww.November 13, 2018, Meeting - Item 3D