My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 11-26-18 Meeting
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2018
>
11-26-2018
>
Agenda Packet 11-26-18 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2018 12:58:33 PM
Creation date
11/21/2018 12:49:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T A B L E G-1 <br /> Potential Impact Reductions, Credits, and Compact Development Adjustments <br />for System Development Charges <br /> NOTE: These are examples only; eligibility is established at time of review of plans which approve the proposed improvements. <br /> <br />1. Transportation System <br />IMPACT REDUCTIONS: <br /> Successful bus pass program for employees <br />CREDITS: <br /> Street width in excess of assessable width <br /> Off-site, non-contiguous arterial or collector intersection <br /> Street light on arterial or collector street <br /> Off-site arterial or collector right-of-way and easement acquisition <br /> Traffic signal on arterial or collector street <br /> Off-street bicycle shared-use paths identified in adopted City plan <br /> Off-site eligible public improvements where equivalent assessments can be collected <br />COMPACT DEVELOPMENT ADJUSTMENTS: <br /> Adjustments based on site’s location in relation to nodal areas, key corridors, frequent transit <br />network routes, and Downtown Plan and West University Commercial Districts boundaries <br /> Transportation Demand Management (TDM) agreement to reduce parking spaces <br /> Secondary Accessory dwelling units (ASDUs) <br /> <br />2. Wastewater System <br />CREDITS: <br /> Public Wastewater collection lines > 8-inch diameter <br /> Public pump stations and pressure lines that serve more than the development <br /> Off-site public improvements, where equivalent assessments can be collected <br /> Prior payment of Metropolitan Wastewater Service District debt service <br /> <br />3. Stormwater System <br />IMPACT REDUCTIONS: <br /> Destination and Quantity: Reduction or elimination by retention of stormwater otherwise <br />discharged into public system <br /> Pollution: Reduction of pollution via approved treatment techniques <br />CREDITS: <br /> Stormwater collection lines > 24inch diameter <br /> Major drainage channels: construction and off-site easement <br /> Off-site public improvements where equivalent assessments can be collected or that <br />benefit existing developments <br /> <br />4. Parks System <br />CREDITS: <br /> Land dedication (for sites accepted by City, consistent with adopted City plans) <br /> On-site park facility dedication (for improvements accepted by City, consistent with <br />adopted City plans) <br /> <br />November 26, 2018, Meeting - Item 4
The URL can be used to link to this page
Your browser does not support the video tag.