258
<br />259
<br />472
<br />560
<br />12
<br />249
<br />390
<br />596
<br />612
<br />613
<br />219
<br />Spyglass Accessway
<br />Holly Ave. Accessway
<br />E 25th Ave. Accessway
<br />Wallis St. Path
<br />Subtotal
<br />61
<br />20 -yr
<br />20 -yr
<br />20 -yr
<br />20 -yr
<br />$64,000
<br />$0
<br />$64,000 100%
<br />$64,000
<br />$25,259
<br />$38,741
<br />$31,000
<br />$0
<br />$31,000 100%
<br />$31,000
<br />$12,222
<br />$18,778
<br />$9,000
<br />$0
<br />$9,000 100%
<br />$9,000
<br />$0
<br />$9,000
<br />$48,000
<br />$0
<br />$48,000 100%
<br />$48,000
<br />$0
<br />$48,000
<br />810,000
<br />$0
<br />$810,000
<br />$810,000
<br />$37,481
<br />$772,519
<br />Park Ave. Overpass
<br />20 -yr
<br />$4,110,000
<br />$0
<br />$4,110,000
<br />100%
<br />$4,110,000
<br />$0
<br />$4,110,000
<br />Amazon Dr. Footbridge
<br />20 -yr
<br />$75,000
<br />$0
<br />$75,000
<br />100%
<br />$75,000
<br />$33,176
<br />$41,824
<br />Jay St. Bridge
<br />20 -yr
<br />$125,000
<br />$0
<br />$125,000
<br />100%
<br />$125,000
<br />$0
<br />$125,000
<br />Grant St.
<br />20 -yr
<br />$900,000
<br />$0
<br />$900,000
<br />100%
<br />$900,000
<br />$0
<br />$900,000
<br />Amazon and 36th Dr.
<br />Footbridge
<br />20 -yr
<br />$75,000
<br />$0
<br />$75,000
<br />100%
<br />$75,000
<br />$33,176
<br />$41,824
<br />Amazon and Dillard
<br />Footbridge
<br />20 -yr
<br />$75,000
<br />$0
<br />$75,000
<br />100%
<br />$75,000
<br />$33,176
<br />$41,824
<br />Amazon and 34'" Ave.
<br />Footbridge
<br />20 -yr
<br />$200,000
<br />$0
<br />$200,000
<br />100%
<br />$200,000
<br />$0
<br />$200,000
<br />Subtotal Grade Separated
<br />$5,560,000
<br />$0
<br />$5,560,000
<br />$5,560,000
<br />$99,528
<br />$5,460,472
<br />.1-15
<br />100%
<br />56%
<br />100%
<br />100%
<br />56%
<br />56%
<br />100%
<br />
|