Laserfiche WebLink
TABLE G-1 <br />Potential Impact Reductions, Credits, and Compact Development Adjustments <br />for System Development Charges <br />NOTE: These are examples only; eligibility is established at time of review of plans which approve the proposed improvements. <br />1. Transportation System 11 <br />IMPACT REDUCTIONS: <br />• Successful bus pass program for employees <br />CREDITS: <br />• Street width in excess of assessable width <br />• Off-site, non-contiguous arterial or collector intersection <br />• Street light on arterial or collector street <br />• Off-site arterial or collector right-of-way and easement acquisition <br />• Traffic signal on arterial or collector street <br />• Off-street shared -use paths identified in adopted City plan <br />• Off-site eligible public improvements where equivalent assessments can be collected <br />COMPACT DEVELOPMENT ADJUSTMENTS: <br />• Adjustments based on site's location in relation to nodal areas, key corridors, frequent transit <br />network routes, and Downtown Plan and West University Commercial Districts boundaries <br />• Transportation Demand Management (TDM) agreement to reduce parking spaces <br />• Accessory dwelling units (ADUs) <br />11 2. Wastewater System <br />CREDITS: <br />• Public Wastewater collection lines > 8 -inch diameter <br />• Public pump stations and pressure lines that serve more than the development <br />• Off-site public improvements, where equivalent assessments can be collected <br />• Prior payment of Metropolitan Wastewater Service District debt service <br />11 3. Stormwater System <br />IMPACT REDUCTIONS: <br />• Destination and Quantity: Reduction or elimination by retention of stormwater otherwise <br />discharged into public system <br />• Pollution: Reduction of pollution via approved treatment techniques <br />CREDITS: <br />• Stormwater collection lines > 24inch diameter <br />• Major drainage channels: construction and off-site easement <br />• Off-site public improvements where equivalent assessments can be collected or that <br />benefit existing developments <br />11 4. Parks System <br />CREDITS: <br />• Land dedication (for sites accepted by City, consistent with adopted City plans) <br />• On-site park facility dedication (for improvements accepted by City, consistent with <br />adopted City plans) <br />City of Eugene SDC Methodologies - General Methodology <br />Page 17 <br />