Laserfiche WebLink
GENERAL METHODOLOGY <br />City of Eugene Systems Development Charges <br />1.0 Introduction <br />The City's authority to establish and adopt system development charges (SDCs) is granted by <br />the Eugene Charter of 1976 and by ORS 223.297 - 223.314. By virtue of that authority, the City <br />adopted Eugene Code, 1971 sections 7.700 - 7.740 and related provisions. <br />For the purpose of interpreting Eugene Code, 1971 sections 7.700 through 7.740 and this <br />document, the public record before the Council shall constitute the legislative history. <br />In addition to the general methodology for each system contained herein, the following <br />appendices are adopted and made a part hereof: <br />A: Definitions of General Terms and Use Codes; and Cross Reference of <br />Wastewater/Parks SDC / HUD BPR Use Codes <br />B: Transportation System Charge Detail <br />Cl: Local Wastewater System Charge Detail <br />C2: Regional Wastewater System Charge Detail <br />D: Stormwater System Charge Detail <br />E: Parks System Charge Detail <br />F: Local System Formulas and General Fee Schedule <br />1.1 Basis for Charge <br />Systems Development Charges (SDCs) have been collected and used by the City of Eugene <br />since 1978. They are presently collected on all new development in the City and are used to <br />fund that portion of the construction of infrastructure (i.e., transportation, wastewater, <br />stormwater and parks system components) required to support new development. These SDCs <br />help the City provide for increased capacity needs, and recoup a portion of the community's <br />investment in specific infrastructure reserve capacity that is already in place. <br />Sound planning requires future demands on each system be anticipated, and that reserve <br />capacity needed to serve future users be built in. By preparing for this growth, standards for <br />community infrastructure are maintained and the community can prosper with new <br />development. <br />The Metropolitan Area General Plan and amendments provide a basis for planning of growth <br />and development and includes the following goals and policies related to the financing of new <br />development: <br />Generally reduce public subsidy for utilities and facilities in new development <br />(#5, p. III -G-5). <br />In general, the amount of public subsidy for public utilities, services and facilities, <br />including schools in new development, shall be reduced (#1, p. III -G-5). <br />City of Eugene SDC Methodologies - General Methodology Page 1 <br />