My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item C: Mixed-Use Centers
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 07/20/05 WS
>
Item C: Mixed-Use Centers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:19:12 PM
Creation date
7/14/2005 1:37:26 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
7/20/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Chambers Residential and Commercial Infill Development <br /> Standards Project <br /> <br />Explanation This project will build on earlier efforts to implement nodal <br />development in an existing built-out neighborhood. Using the Chambers Node <br />Development Plan as a foundation, the City will (1) identify regulatory barriers and <br />gaps that impede the creation of high quality infill and redevelopment projects, and <br />(2) develop a set of commercial' and a set of residential design standards to guide <br />infill and redevelopment in this mature neighborhood. <br /> <br />Thirty three of Eugene's 38 potential node sites are redevelopment (as opposed to <br />"greenfield") sites. This project will address one of the main obstacles to <br />implementation of the nodal development concept in Eugene. That obstacle is the <br />inadequacy of the existing development codes to address the impacts of infill and <br />redevelopment on surrounding development, and on the neighborhood as a whole. <br /> <br />Major Tasks: · Develop specific work program for this task <br /> · Intergovernmental Relations Committee review <br /> · Prepare presentation on examples of neighborhood-scale infill and <br /> redevelopment projects <br /> · Identify community and City concerns with infill and redevelopment projects <br /> within the City of Eugene <br /> · Identify barriers and gaps that impeded infill and redevelopment <br /> · Prepare and conduct design preferences survey <br /> · Prepare draft commercial and residential development standards for infill and <br /> redevelopment <br /> · Test application of standards on hypothetical developments <br /> · Propose separate process for reviewing and approving infill and <br /> redevelopment projects within a node, if desired. <br /> · Prepare materials for PC work session and hearing <br /> <br />Timeline: August, 2004 through December, 2005 <br /> <br />6. Mixed Use Zoning Districts <br /> <br />Explanation: Prepare and adopt appropriate mixed use zones to promote and <br />encourage _smart development. Eugene has draft commercial and residential mixed <br />use codes prepared for Royal and Chase Gardens nodal development projects that <br />would ~erve az a baseline for Orafting n~w comprehensive codes. Work ~hould al~o <br />include drafting a mixed u£e code for emplo~.e_n_( grCa~ lik~ the Campua Indua[rial <br />zonc. <br /> <br /> 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.