My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 1-14-19 Meeting
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2019
>
01-14-19
>
Agenda Packet 1-14-19 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 9:24:06 AM
Creation date
1/11/2019 9:20:27 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Packet
CMO_Meeting_Date
1/14/2019
Signature_Date
1/14/2019
CMO_Effective_Date
1/14/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sebring (A 18-9) December 2018 Page 3 <br />system (and owned by the applicant). As an informational item, there is a wastewater <br />assessment found that needs to be paid prior to any development. <br />Stormwater <br />Public stormwater is not available to serve these lots at the present time. Records show <br />that the soils are mapped Type B, indicating fairly good infiltration. Testing may be <br />required at the time of development to demonstrate adequate percolation rates and the <br />applicant must discharge its stormwater runoff from impervious surface to an approved <br />point of discharge and demonstrate the downstream capacity for stormwater disposal. <br />Transportation <br />The property fronts Lindley Lane, a local street owned and maintained by the City of <br />Eugene. Access management and street standards will be evaluated at the time of <br />future development. <br />Solid Waste <br />Collection service is provided by private firms. Regional disposal sites and the Short <br />Mountain Landfill are operated by Lane County. <br />Water and Electric <br />EWEB Water staff state no objection to the annexation. EWEB Electric staff also state no <br />objection to the annexation. Water and electric services can be extended to the subject <br />property in accordance with EWEB policies and procedures. <br />Public Safety <br />Police protection can be extended to this site upon annexation consistent with service <br />provision through the City. Fire protection will be provided by Eugene Springfield Fire. <br />Emergency medical services are currently provided on a regional basis by the cities of <br />Eugene and Springfield and will continue in the same manner upon annexation. <br />Parks and Recreation <br />Parks and recreation programs are provided on a City-wide basis. The inclusion of the <br />subject property in the City is sufficient evidence to demonstrate the minimum level of <br />this key urban service is met. <br />Planning and Development Services <br />Planning and building permit services are provided for all properties located within the <br />urban growth boundary by the City of Eugene. The Eugene Code, Chapter 9, will provide <br />the required land use controls for future development of the subject property upon <br />annexation. <br />Communications <br />A variety of telecommunications providers offer communications services throughout <br />the Eugene/Springfield area. <br />January 14, 2019, Meeting – Item 3C
The URL can be used to link to this page
Your browser does not support the video tag.