Laserfiche WebLink
Section 2. Section 9.0500 of the Eugene Code, 1971, is amended by deleting the definition <br /> <br />of "Response Time" therefrom. <br /> <br />ectmn 3. Section 9.2510 of the Eugene Code, 1971, is amended ro provide: <br /> <br />%2510 Nat. ural Resource Zone Siting_~Requirements~ If consistent with the approval <br /> criteria in EC 9.8865 Zon~ Chan~pProval _C'.riteria, the NR zone may be applied to <br /> wetlands~ water features and other natural areas that are: <br /> (1) Not included on the cit.v's acknowledged Goal 5 inventory and are: <br /> (a) Recognized as a locally outstanding natural resource area in an adopted <br /> plan; or <br /> (b) Less than 5 acres in size arid providing habitat for a federally listed rare, <br /> threatened, or endangered plant or animal species; or <br /> (c) Less ~(han 5 acres in size and serving at least 2 of the natural functions and <br /> values listed in EC 9.2500 Purp~ose ofNR Na..tural Resourg¢ Zone. <br /> (2) tncluded on the city's acknowledged Goal 5 inventory and are designated as <br /> "wetlands to be protected" or "wetlands to be enhanced for mitigation credit" on <br /> Map 3 of the adopted West Eugene Wetlands Plan and acquired by a public <br /> agency or non-profit conservation organization. <br /> <br />Section 4_~ Subparagraphs (3)(c)3. and (4)(g) of Section 9.2520 of the Eugene Code, 197 t, <br /> <br />are amended, and Subsection (4)(h) is deleted, to provide: <br /> <br />9.252~ <br /> <br />Natural Resource ZoneLa_nd Use and Permit Requirements. The provisions of <br />the NR zone do not exempt a person or property from state or ~bderal laws and <br />regulations that protect water quality, wetlands, or other natural areas. In cases where <br />the NR zone overlaps with the/WB wetland buffer overlay zone or the/WP waterside <br />protection overlay zone, only the provisions of the NR zone are applied. <br /> <br />(3) Uses Subject to Standards Review Approval. The following uses are <br /> permitted within the NR zone subject to the standards review process beginning <br /> with EC 9.8460 Purpose of Standards Review: <br /> <br />(c) <br /> <br />Construction of stormwater quality treatment facilities that use <br />biofiltration methods, such as shallow grassy swales, constructed <br />wetlands, and sedimentation ponds, and do not include adding impervious <br />surfaces. Subject to EC 9.2530 Natural Resource Zone Development <br />Standards (2) through (9). As used in this subsection: <br /> <br />In areas not included on the city's acknowledged Goal 5 inventory, <br />structures tbr the control of water are not considered impervious <br />surfaces for the purposes of this section. <br /> <br />Ordinance - 3 <br /> <br /> <br />