Laserfiche WebLink
1 <br /> <br /> <br />Proposed Investment Packages <br />Purpose: Select five Investment Packages that reflect varying levels of investments and are based on the <br />technical analysis and community feedback. <br />Technical Analysis <br />The technical analysis that was completed for each corridor is detailed in the Alternatives Analysis <br />Report and summarized in the Alternatives Analysis Executive Summary. The technical analysis <br />recommended that the following mode options be considered for the Investment Packages. <br />Table 1: Recommendation on Corridor Alternatives to be Considered for Investment Packages Based on <br />Technical Analysis <br /> Alternative <br />Corridor No-Build Enhanced Corridor EmX <br />Highway 99   <br />River Road   <br />30th Ave to LCC    <br />Coburg Road    <br />MLK, Jr. Boulevard   <br />No-Build Alternative: Under the No-Build option, LTD and the City would only make improvements that <br />are already planned as part of other projects for the next ten years. No additional investments would be <br />made as a part of the MovingAhead project A No-Build alternative is included and evaluated in the <br />context of the federal environmental review. While the No-Build alternatives are shown to have no <br />negative effects in the federal context, doing nothing now to enhance walking, biking, and transit use <br />does not help achieve locally adopted policy goals. In the local context, the no-build alternative does <br />have consequences. It should be noted corridors designated for No-Build in the MovingAhead <br />investment packages would be considered for Enhanced Corridor or EmX investment in the future. <br />Enhanced Corridor: The Enhanced Corridor option is intended to improve safety, access, and transit <br />service without requiring major capital investments. This alternative is very flexible and can range from <br />limited improvements to a relatively high level of investments that approach an EmX treatment. <br />Enhanced Corridor service may or may not be branded. While Enhanced Corridor investments have been <br />February 19, 2019, Work Session - Item 1