Laserfiche WebLink
18 <br /> <br />Investment Package Summaries <br />The following two tables summarize the evaluation of the five investment package. The first table shows <br />the scores for the criteria for each investment package. The second table converts these scores into <br />ratings. <br /> <br />Evaluation Measure <br />Bike/Ped Access and Safety <br />Investments (1-5 rating) <br />Capital Cost (millions) <br />Consistency with Local Plans and Policies <br />Investment in Corridors with Higher Level of <br />Low Income and Minority Population (Percent) <br />Number/Acreage of Acquisitions 115 ∕4.1 84 ∕3.5 137 /4.6 150 ∕5.0 177 ∕8.4 <br />Operating Cost: Systemwide Change from No- <br />Build (millions) <br />Parking Impacts: Corridor On-Street and Off- <br />Street Parking Impacts (number of spaces) <br />Potential Property Displacements <br />Ridership: Annual Systemwide Increase <br />Compared to No-Build <br />Support Corridor Development and <br />Redevelopment (1-5 rating) <br />Support from the Public (1-5 rating) <br />Transit Travel <br />Time Improvement <br />Trees: Number of Medium and Large Trees <br />Impacted <br />3.2 3.4 4.4 <br />3.6 3.63.63.43.1 <br />164 222146 432103 <br />1,327,000 <br />4.4 <br />50% <br />4.6 <br />666 <br />68%76%98% <br />2.2 3.0 3.4 <br />521,000576,000385,000 <br />3.53.12.4 <br />$2.5 <br />$119 <br />$1.9 $3.0 <br />2.4 <br />Enhanced <br />Corridor <br />Package <br />$148 <br />-$0.1 <br />21% <br />389,000 <br />3.0 <br />56% <br />3.0 <br />4 <br />188 <br />3.2 <br />Scores for Each Investment Package <br />148 217 375 <br />8 <br />$202$181 <br />22%13% <br />EmX <br />PackagePackage CPackage BPackage A <br />$335 <br />$8.2 <br />25% <br />81 <br />23% <br />February 19, 2019, Work Session - Item 1