Laserfiche WebLink
MovingAhead 2018 Outreach Summary 9 <br />Online Feedback <br />Online open house participants were asked to rate the corridors in the same manner as the participants <br />at the in-person open houses. As shown in Figure 8, online open house participants generally favored <br />the build options over the No-Build options. Participants indicated preferences for Enhanced Corridor <br />over EmX on Coburg Road and Highway 99, while they indicated a preference for EmX on River Road. <br />Both build options received similar ratings for the 30th Avenue to LCC corridor. <br /> <br />Figure 8 <br />Looking at the data in more detail (see Figure 9), the in-person and online results show a similar pattern, <br />in that EmX options tended to be more polarizing with large amounts of “works well” ratings, but also <br />more “serious concerns” compared to the Enhanced Corridor options. In the online results, the <br />Enhanced Corridor options generally received more “works well” — which is why they tended to get <br />higher average ratings compared to the in-person results. <br />February 19, 2019, Work Session - Item 1