My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20258
COE
>
City of Eugene
>
Ordinances
>
2002 No. 20242-20273
>
Ordinance No. 20258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:43:58 PM
Creation date
7/21/2005 3:58:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/8/2002
Document_Number
20258
Author
James D. Torrey
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ST E~NE PARJG~Ay ~DiFIED PROJECT--CONSISTENCY ~TH THE STAT~'~mr~ ~ ................. <br /> ....... r~*u~mr~ ~ AND TRANSPORTATION PLANNING RULE <br /> <br /> OAR <br /> OAR 660-012-0070(2) provides that where exceptions to Goals 3, 4, 11 or 14 are required, "the <br /> exception shall be token pursuant to ORS 197.732(1~c), Goal 2, OAR 660, D~v~s~on 4 ~d hh~s <br /> d~vision/~ Because OAR 660, D~v~sions 4 and 12 ~mplement Goal 2 and ORS 197.732(1)(c), a <br /> demons~afion of compliance with these administrative rule requirements demons~ates compliance <br /> wkh all of these review s~nd~ds.30 <br /> <br /> Th~s technical memorandum provides the findings of fact and m~ons demons~ating ~mpl~ance wkh <br /> the applicable exception s~ndards, ~s required by Goat 2 ~d ORS 197.732. <br /> <br /> OAR <br /> OAR 660-012-0070(3) requires that "an exception adopted ~ p~ of a TSP or refinement pl~ shall, <br /> at a m~nimum, decide ne~, mode, function and general locmion for the propos~ healthy or <br /> ~mprovement. <br /> <br /> As note~ above, ff~e West Eugene Parkway project is already an element of the TransPlan and the <br /> e Coun~ R~oI Comprehe~ive plam3~ ~e ac~owledged 1986 exception ~deafifi~ the need for <br /> project32 and detemined ~ts mode (h~ghway), function (l[mit~ access major ~edal) and general <br /> location ~is cu~ent exception ~s required only to change the general l~afioa of the approved <br /> hc~lky from south of the m~lroad ~acks to nomh grease trac~. <br /> <br />F~gure 1 Shows ~e co~dor wkh~n which ~e Modified Project would be lommd. The Modified <br />Project would have ~bur 12-foot w~de ~avel lanes w~ 8~foot wide shouldem on the ou~[de of the <br />Ianes. A center median would v~, in w~dth from 12 to 14 feet. See Roadway Profiles at F~gure 2-3 of <br />tbe SDEZS. The alignment shi~ no~hward from the Approved Design would be accomplished w~ a <br />grade-sep~ated crossing over the Central Oregon ~d Pacific m~lroad tracks and the Amain <br />Channel near Te~ S~eet. <br /> <br />The precise l~fion of the hc~l~W wkh~n the co~dor w~ll be detemined during prQect design. <br />Becau~ the hcil~W ~s a state highway, ~ts design and cons~ucfion w~ll comply wkh es~bl[shed <br />ODOT s~nd~ds for ~nsmcfing urban, s~tew~de limked ac~s facilk~es, ~d w~ 1~1 s~ndards <br />and pr~edures when appl~mble. <br /> <br />OAR 660,0i2-0070{4), ORS igL732{i}{c)(A), Goal 2 Part ll(c){i), OAR 660-004. <br />0020(2)(a) and OAR <br />OAR 660-012-0070(4) states: <br /> <br /> "To address Goal 2, Part II(c)(1) the exception shall demonstrate that there is a transportation <br /> need identified consistent with the requirements of 660-012-0030 which cannot reasonably be <br /> accommodated through one or a combination of the following measures not requiring an <br /> exception: <br /> <br />"(a) Alternative modes of transportation. <br /> <br />30 The ~anguage in ORS 197~732(1)(c) is identical to the Goa~ 2 exception language set out above in the analysis of <br />compliance w~th statewide p~anning goal 2. <br />31 Beceuse the TransP~a~ was adopted pdor to LCDC adoption of the Transportation Planning Ru~e, ~t ~s nat a TSP as that <br />term is used Jn the mia. The Large Counci~ of Governments is currently developing a regional TSP to comply with TPR <br />require~nts. ~rding to City of Eugene Planning Director Jan Childs, that p~an currently ~s scheduled for headngs in the <br />of 1999, with adoption unlikely pdor to June <br />32 The 1986 exception k~ent!fies this prole~ as needed to provide a safe transition to Highway ~26 and to avok~ the existing <br />na~ow, ~rved ore.ass at ~e Southern Pac~c [now Central Oregon and Pac~c] railroad tracks. Add~ional need for this <br />project is described below. <br /> <br />E)CqIBiT C~i - FiNDiNGS 2~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.