My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20258
COE
>
City of Eugene
>
Ordinances
>
2002 No. 20242-20273
>
Ordinance No. 20258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:43:58 PM
Creation date
7/21/2005 3:58:31 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
7/8/2002
Document_Number
20258
Author
James D. Torrey
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W~ST E~NE PAPJ<~AY ~RED PRO~JECT--CONSISTENCY ~TH THE STATE. DE ~NNING GOALS AND TRANSPORTATI~ PLANNING RULE <br /> <br />bicycle and pedestrian circulation and reasonably direct routes for bicycle and pedestrian travel in <br />areas where usage of these modes is likely. <br /> <br />In August, 1997, LCOG analyzed the potential for public transportation in the regiom This study <br />consisted of market analysis, system analysis, and findings and conclusions, and it incorporated TDM <br />strategies, transportation system features and land use changes to support mixed use developments. <br />LCOG concluded that an improved transit system, together with nodal mixed use development <br />patterns, would act in a complementary manner and improve overall transit ridership in the region. <br /> <br />The improved transk system incorporates the aggressive Bus Rapid Transit pilot pr0jec[ BRT <br />consists of high-frequency, fast transit service along major transportation corridors~ with small bus <br />service in neighborhoods that connects Mth the BRT corridor service and with nearby activky <br />centers. The BRT system is based on light rail principles, but instead of the required capital <br />inves~ent in trains and track, k utili~s buses in service that is integrated with key components of the <br />existing automobile transportation infrastructure, such as roads and rights-of-way, intersections, and <br />traffic signals. <br /> <br />The BRT system would be used as a complementary element to the regular public transit service <br />provided by Lane Transk District. Se~ice frequencies would be similar m regular services with 10- <br />minute headways during daytime peak hours and 20-minute headways during daytime off-peak hours <br />and on evenings and weekends. BRT would employ several features to decrease travel time, including <br />exclusive bus lanes, transit priority t~eatrnents (e.g., preferential traffic signal timing and queue- <br />jumpers), extended stop spacing, enhanced shelters and boarding areas, and a barrier-free fare <br />systemfi7 <br /> <br />Improving the transit system through a combination of BRT and nodal mixed-use, pedestrian-friendly <br />development cle~ty can significantly increa~ the modal share assigned to transit. Moreover, the <br />BRT system is expected to serve West Eugene ~rough its extension along the West 11 Avenue <br />corridor. However, no~khstanding anticipated increases in transit ridership and the increase in <br />transit's modal share of all trips, West 1 tth Avenue still will not function adequately without the <br />WEPfi8 The volume to rapacity ratios at the intersections of West 1 lth Avenue wkh Green Hill <br />Road, Danebo Avenue, Beltline HighWay, Bertelsen Road, Bailey Hill Road and Senec~ Road will <br />continue to exceed 1.00 without the WEP, with the ratio at Beltline Highway estimated at 1.50.s~ <br />Clearly, travel by alternative modes, combined with TDM and traffic management improvement <br />measures, does not eliminate the need for the WEPfi0 The new roadway is still needed to serve <br />existing and planned growth and statewide and regional trips. <br /> <br />Transportation t~anagement and Transportation Demand ~easuras <br />Transportation management measures include techniques for increasing the efficiency, safety~ <br />capacity or level of service of a transportation facility wkhout increasing its size. Examples include <br />traffic signal improvements, traffic control devices including installing medians and parking removal, <br />channelization, access management, ramp metering, and restfip[ng of high occupancy vehicle (HOV) <br />lanes. See OAR 660-012-0005(25). <br /> <br />Measures such as ramp metering and high occupancy vehicle lanes are not appropriate for West 1 <br />Avenue~ These measures apply more to freeway projects experiencing efficiency or capacity <br />deficiencies. Median barriers along West 1 lth Avenue also are not appropriate given the existing strip <br /> <br />57 Attomative Memorandum at <br />58 Attematives Memorar~dum at <br />59 A~omativesMemomndum~ Ap~nd~x <br />60 The f~ums se~ out ~n Appendix B of the A~ematives Memorandum ~nc~ude TDM <br /> <br />EXH~Bff C-i - FiNDiNGS 30 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.