Laserfiche WebLink
ALTERNAT)~$ ~S:~D - WEP <br /> <br />Highway to access the WEP~ Re EPA Alternative does not comply with bicycle and pedestrian <br />requirements of the TranspoFtation planning RUle (TPR). <br /> <br />his alternative fails to meet the proj~t pu~ose and need because it would not meet the <br />operational requirements of an expressway using only intersections and existing rights-of- <br />way~ NmerOus intersections fail to meet mobility standards of LOS D or be~er for <br />Signalled and LOS E or better for unsignalized intersections. <br /> <br />Traffic at the intersection at West 11a and Beltline would be 240 percent over capacity <br />Traffic at the intersection at West 11 th and Danebo would be 184 percent over capacity <br />Traffic at West 11t~ and Green Hill would be 111 percent over capacity <br /> <br />~ese congestion problems cause this alternative to be unsafe and inet25cient and ~erefore, <br />~easonabte. <br /> <br />EPA Optimized A)temative <br /> <br />This alternative generally would follow the same concept of the EPA Alternative, except the <br />facility would be designed to meet the level ofservSce requirements of a parkway to the <br />western terminus near Oak Hill. This alternative would potentially require interchanges at <br />WEP/Betttine Highway, Beltline H st 11t~ Avenue, and West 1 It~ Avenue~Terry <br />Street, and frontage roads along much, if not all, of the section west of Beltline in order to <br />achieve acceptable operating conditions. To address addkional capacity requirements and <br />provide for safe operations there would need to be the following changes to the transportation <br />system: <br /> <br /> Added east m west connections between Danebo Avenue and Beltline Highway, <br /> Closure of the Danebo Avenue/West 1 lth intersection, <br /> Extension of Tero~ Street to West 11 th Avenue, and <br /> Substantial widening (potentially up to a total of 8 lanes along portions) of'West 1 lth Avenue. <br /> <br />Project design engineers and planners have determined that this alternative is not reasonable. There <br />simply is not enough room between Terry Street and the proposed WEP/Beltline Highway <br />interchange (inclusive) to place ~e three interchanges needed and meet the design requirements of <br />the project. Moreover, a~y design that would remotely approach meeting the geometric design <br />requirements would: <br /> <br /> * Displace substantial property ~sociated with the West La~,m Mernorial Park cemelery <br /> and/or the Lane Memorial Gardens cemetery <br /> e Displace several commemial or industrial properties in the vicinity of the West 11 ~ <br /> Street ~d Beltline/West 11t~ Avenue interchanges including the Baxter RV <br /> Center, and businesses along Arrowsmith Street and Terry Street. <br /> <br />Green Hil~ Road Alternative <br />This alternative would use the Modified Project alignment between Highway 99 and Green <br />Hill)Road, extending the roadway improvements south of the railroad tracks to the western <br />terminus of the WEP via two optional alignments. <br /> <br /> <br />