Laserfiche WebLink
intersecting angle of the roads, thereby fi~er increasing the adverse impacts to the <br />affected neighborhood's identity/cohesion <br /> <br />Substantial impacts between Terry Street and western project terminus, including: <br /> <br />- Roadway placement within the Amazon Channel floodway, including areas within the <br /> 2-year floodway being considered for floodplain widening u~der the Army Corps of <br /> Engineers' 1135 project <br />- Crossing approximately 1.3 km (0.8 mile) of Section 4(f) properties owned by the <br /> BLM or City- of Eugene for protection/restoration purposes, including bisection of <br /> habitats, and d nt of two wetland/ponds/vernal pools between the current end <br /> of Roosevelt Boulevard and the Amazon Channel <br />- Potential direct or indirect impacts to ESA-listed species located in the vicinity of the <br /> Roosevelt/Green Hill Road intersection <br /> <br />Combined, these impacts would be of such magnitude m co~ercial land inventor},, <br />employment~ loml income and m base, co~i~ cohesion, and protection of habitat areas <br />included in the West Eugene Wetlands Plan area, as to render this alternative not prudent. <br /> <br /> <br />