Laserfiche WebLink
Part Tw : Projected Plan Performance <br />The combination of land use, transportation demand management (TDM), and transportation <br />system improvement (TSI) progr~ and capital investments included in TransPlan is the result of <br />a comprehensive evaluation of alternative scenarios. This technical analysis provided a process <br />to determine the relative significance of alternative scenarios and the desirability of one scenario <br />over another. <br /> <br />The main fbcus of reviewing the performance of the plan is to assess how the proposed <br />investments and actions are either: <br /> <br />1) Improving existing conditions, or <br />2) Avoiding undeskable conditions that would be present without the plarmed investments and <br /> actions. <br /> <br />Table 6 shows data for existing conditions and projections for two future scenarios: Ex~sl~g Conditions 1995, shows systern performance as of 1995. <br /> The first future scermrio, 2015 Trends, shows system performance for 1995 conditions <br /> extended into the year 2015. This scenario shows projections of what is expected to happen <br /> by 2015 under business as usual trends~ <br /> The second fi~ture scenario, 2015 Financially Constrained Trat, sPlan, shows projected draft <br /> TransPian performance for the year 2015 under conditions of financial consent. Like the <br /> second scenario, it ~sumes implementation of land use and TDM strategies. Transit, bicycte, <br /> and roadway capital actions are limited to financial resources expected to be available to the <br /> region as discussed in Chapter 3. Capital actions identified as Future in Chapter 3 are not <br /> included in this scenario. <br /> <br />For each future scmnario presented in Table 6, the amount for each performance measure is listed <br />along v,4th the percentage change in that performance measure from 1995 conditions. In the <br />descriptions of performance measures that follow, except where explickly noted, comparisons are <br />drawn between 1995 Existing Conditions and the 2015 Financially Constrained Trans?lam <br />~han~ to ~aeyfo~ance megsures resultin~ from the_West Eugene Parkwag-related amendment to <br />~ransPlg¢~ are prese_ntedin [his ~h~pter i~-'~e~slafive format, <br /> <br />~ general, implementation of the 2015 Financially Constrained TransPlan is projected to serve <br />the region's fumm traveI needs for people and goods, while turning the transportation system and <br />the service it provides in a more deskable direction than existing trends. The proposed plan <br />reflects a set of tradeoffs among the communities' goals and objectives. A comprehensive set of <br />transportation system performance measures provides the framework for a meaningful compahson <br />of the scenarios. <br /> <br />Exhibit A ~ Page 49 <br />TransP1 an Amendments <br /> <br />CkaptCr 4; Page 4 <br /> <br /> <br />