Laserfiche WebLink
Primary Drainage Channels - Construction <br /> Timing: Flexible, depending on timing and location of <br /> development <br /> Cost: $730,000 <br /> Funding Source: Storm water Utility Fund, Storm water SDC <br /> <br />Page D-4. Revise the Storm Water Drainage description as fbllows: <br /> <br />The City will purchase land needed to construct the drainage system and will design the <br />system beginning in FY 2004. Construction of ~ the system ~ will be <br />delayed until new development is approved in the node. <br /> <br /> ba~:t r~ th~, Cu=em city policy would <br />require a determination of-what potion of the open system would be ~e equivalent of a <br />24" piped system. The cost of providing drainage to the equivalent area would be <br />assessed to benefi~ing prope~ies in the ~ea. The City could ass~e ~e cost of <br />providing drainage to the area in excess of the 24" equivalent area. Assessments would <br />include the cost of acquiring l~d on which the chapels would be constructed. Property <br />owners within the node will not be assessed for drainage improvements until their <br />properD' is annexed to the Ci~ and a development proposal is approved on that <br />property. <br /> <br />Errata5 <br /> <br /> <br />