My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-19-04
COE
>
City of Eugene
>
Administrative Orders
>
2019
>
Admin Order 58-19-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 11:48:07 AM
Creation date
4/1/2019 11:47:07 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EUGENE VISION ZERO <br />Street Design <br />Actions in this area will influence the physical design of Eugene's streets and the process by <br />which street designs are developed and approved . <br />Key Implementers <br />· City of Eugene Department of Fire and Emergency The City is already taking <br />a major step this year Medical Services <br />· City of Eugene Department of Planning and Development <br />· City of Eugene Department of Public Works <br />to improve the safety <br />of its street design with <br />development and planned <br />adoption of updated <br />Street Design Guidelines <br />that recommend features <br />for new streets and <br />retrofits to existing ones . <br />· Lane Council of Governments (LCOG) Safe Lane <br />Coalition <br />· Lane County Public Works <br />· Oregon Department of Transportation <br />· 4J and Bethel School Districts <br />Two-year actions <br />SD-1: Build capital safety infrastructure improvements along the Vision Zero High Crash <br />Network each year. Example: Construction of a median island with additional enhancements <br />to create a safer crossing for pedestrians and/or bicycl ists on a wide street. <br />SD-2: Implement signal phasing and operational changes for the High Crash Intersections <br />each year. Example: Implement signal timing and phasing modifications or upgrades to <br />reduce crashes and improve safety. <br />SD-3: Use assessment of demonstration or pilot projects as proof of concept for safety <br />infrastructure changes on the Vision Zero high crash streets and intersections. <br />SD-4: Prioritize street maintenance (surface and striping) on the Vision Zero high crash <br />streets and intersect ions . <br />SD-5: Prioritize sidewalk infill, inspection and maintenance of sidewalks on the <br />High Crash Streets for People Walking . <br />SD-6: Review resurfacing and restr iping maintenance projects with the safety of all users in <br />mind. <br />SD-7: Integrate Vision Zero into the City 's development review checklist to ensure that public <br />rights-of-way are being designed for t he most vulnerable users of our streets . <br />SD-8: Review and revise City code governing site des ign's interface with the public right-of- <br />way to incorporate safe design standards for all modes and to prioritize safety along the high <br />crash network. Example : current driveway/access management code (Chapter 7). <br />32
The URL can be used to link to this page
Your browser does not support the video tag.