Laserfiche WebLink
The prOPerty owned by ~¥dum (TL#1704291100100) is a comer lot of approximately 0.34 acres. <br />This property was assessed for Terry Street improvements for a frontage of 95 feet under an older <br />version of the code~ Primary access (the driveway and address) for this lot is from Royal so a <br />paving assessment was assessed for Royal frontage of 80 feet. <br /> <br />Property owned by Jones (TL#17042000 03800) is a comer lot that is subject to a deferred <br />assessment for Terry Street improvements. The driveway access is off Terry Street. There is not <br />a drivewa-y off of Royal Avenue. The Jones' is on Royal Avenue, so, by the provisions of the <br />Eugene Code, the Jones would be considered to have primary access on Royal. However, to <br />maintain traffic flow on Royal as a minor arterial, it would be best if access off of Royal was <br />limited, At the LID formation consideration was given to physical access, assessments already <br />levied to this property and ~e intent regarding assessments for residential comer properties, llt <br />was determined that no pavement assessment on Royal would be levied against this property. <br />Only sidewalks have been assessed per (EC 175(5)(e)). <br /> <br />PrOPerties that abut the street were assessed for 3.5 feet of pavement width of knprovement on a <br />per front foot basis, and for driveway aprons and adjustments. <br /> <br />The final unit assessable costs are calculated to be: <br /> <br />3.5-foot Paving (per front foot) <br />Wastewater (per square foot, 160 foot depth) <br />Sidewalks/Driveway Apron <br />Wastewater Service Line (each) <br /> <br />$ 20.29 <br />$ .16 <br />$ 3.01 <br />$1,258.97 <br /> <br />The City will pick up the cost for paving beyond 3.5 feet, non-assessable curb and gutter and <br />sidew~k, street lights, street trees and a portion of the storm drainage system as identified by <br />City Code, Chapter 7. For the project as a whole, costs are divided as follows: <br /> <br />Total Assessable Cost <br />Low Income Subsidy <br />Delayed/On Hold <br />Total City Cost <br />Total Project Cost <br /> <br />$ 82,081.48 <br />$ 2,763.47 <br />$ 39,286.72 <br />$ 421,256.47 <br />$ 503,337.95 <br /> <br />PAV~G, CURBS AND GUTTERS, SIDEWALKS, AND STORM SEWERS ON ROYAL AVENUE <br />FINAL ASSESSMENT Page 3 <br /> <br /> <br />