My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20288
COE
>
City of Eugene
>
Ordinances
>
2003 No. 20274-20306
>
Ordinance No. 20288
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 4:44:37 PM
Creation date
7/26/2005 5:44:39 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
5/12/2003
Document_Number
20288
CMO_Effective_Date
5/12/2003
Author
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CoSts listed below are the estimated aSsessment costs calculated at the time of the formation of <br />the LD~ A contingency was included in the estimate. <br /> <br />3.5~foot Paving (.per f~ont foot) <br />Wastewater (per square foot~ 160 foot depth) <br />Sidewalks/Driveways Cer square fbot) <br />Wastewater Service Line (each) <br /> <br />$ 24.00 <br />$ 0.17 <br />$ 3ot4 <br />$1,218.00 <br /> <br />The prqiect total cost of $533,300 is fimded from several sources: <br /> <br />Assessment's streets storm & wastewater <br />Lane County Road Fund <br />Cky of Eugene SDCs <br /> <br />$ 51,800 <br />$225~000 <br />$256,500 <br /> <br />~COMMENDATION <br /> <br />The fin~ total improvement costs are lower than those quoted at the local ~mprovement hearing <br />and are comparable to projects of similar size. Staff recommends approval of the assessment as <br />calculated and that the Council levy the final assessment. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.