Laserfiche WebLink
Based upon the information provided by the City Engineer's office and testknony offbred at the <br />M%, 28, 2003 public hearing, the Hearings Official finds that the final improvement costs <br />proposed to be assessed are the same as those quoted at the local improvement hearing and are <br />comparable to or lower than projects of similar size. The Hearings Official further finds that the <br />proposed assessments are calculated in accordance with the Eugene Code and that the project is <br />one for which the assessments are for a local improvernent as set forth in ORS 3 I0.140 because: <br /> <br />(1) <br />(2) <br /> <br />(3) <br />(4) <br /> <br />he assessments do not exceed actual costs; <br />The assessments are imposed for a Capital Improvement Construction Prqiect which <br />provides a specific benefit to a specific property or rectifies the problem caused by a <br />specific property; <br />The assessments ~e imposed in a single assessment upon completion of the project; and <br />The assessments allow the prope~ owners to elect to pay off with interest over at least <br />ten (10) years. <br /> <br />Accordingly, the Hearings Official recorrnnends approval of the assessmems as calculated and <br />that the Council levy the final assessments. <br /> <br />Respectfully <br /> <br />~u~gsOffic[al <br /> <br />Findings and Recommendations for Final Assessment- Job 3990 Page 4 <br /> <br /> <br />