Laserfiche WebLink
Metropolitan Wastewater Management Commission Capital Improvement Program <br />RECYCLED WATER DEMONSTRATION PROJECTS <br />(P80099) <br />Description: <br /> This project provides for the design, construction, permitting, and implementation of <br />recycled water demonstration site needs beyond the production and distribution of Class <br />A recycled water for use. Project may entail onsite upgrades and retrofits to allow the use <br />of recycled water in partnership with end-users and point of delivery plumbing and <br />controls. <br />Status: <br />Preliminary design phase. <br />Justification: <br /> Demonstration of the MWMC’s capability and consistency of recycled water for use in a <br />safe, effective, and publicly accepted manner is a key step toward future, larger-scale, <br />recycled water uses. Future recycled water uses may be an important strategy for <br />diverting effluent from the Willamette River to meet NPDES permit discharge limits as <br />well as to meet growing community water resource and resiliency needs. <br />Project Driver: <br />The Phase 2 recycled water implementation/thermal load mitigation study recommended <br />demonstration scale use of Class A recycled water to address stakeholder acceptability <br />issues identified as barriers to full-scale recycled water uses. <br />Project Trigger: <br />Pilot recycled water demonstration sites with willing, ready-to-proceed partners have <br />been identified, including City of Eugene street tree watering and industrial aggregate site <br />. <br />equipment washing <br />Improvement <br />SDC Eligibility: <br /> 26.1% <br />Estimated Project Cost: <br />$1,245,000 <br />Estimated Cash Flow: <br />FY 18-19 = $0; FY 19-20 = $180,000; FY 20-21 = $565,000; FY 21-22 = $500,000 <br />Prior2018-19 <br /> Expenditure/Category:YearsEst. Act.2019-202020-212021-222022-232023-24Total <br /> Design/Construction$0$0$180,000$565,000$500,000$0$0$1,245,000 <br /> Other$0$0$0$0$0$0$0$0 <br />Total Cost$0$0$180,000$565,000$500,000$0$0$1,245,000 <br />Page 56 FY 19-20 BUDGET AND CIP <br />- ¸ ΐΒǾ ΑΏΐΘǾ 7®±ª 3¤²²¨®­ ȟ )³¤¬ Β# <br /> <br />