My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/13/19 City Council Agenda Packet - meeting
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2019
>
05-13-19
>
05/13/19 City Council Agenda Packet - meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2019 9:58:44 AM
Creation date
5/3/2019 9:58:22 AM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Meeting
City_Council_Meeting_Date
5/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metropolitan Wastewater Management Commission Capital Improvement Program <br />TERTIARY FILTRATION - PHASE 2 <br />(P80102) <br />Description: <br /> The phased work program will install infrastructure/support facilities for 30 mgd of filters <br />for tertiary filtration of secondary treated effluent. Phase 2 is planned to install filter <br />system technology sufficient for another 10 mgd of treatment that will increase the total <br />filtration capacity to 20 mgd. The Phase 3 project will install the remaining filtration <br />technology to meet the capacity needs identified in the 2004 MWMC Facilities Plan. <br /> In 2016, the project scope expanded to include updating electrical switchgear and install <br />tertiary filter flushing headers/pipe vents. <br />Status: <br />Tertiary Filtration (Phase 2) project is anticipated to start design development in fiscal <br />year 22-23. <br />Justification: <br /> The 2004 MWMC Facilities Plan proposes phasing filters on a phased work program. <br />Filtration provides high quality secondary effluent to help meet permit requirements and <br />potential Class A recycled water product. <br />Project Driver: <br />Performance reliability to meet the dry weather NPDES total suspended solids limits of <br />less than 10 mg/L, reuse development, and compliance with effluent limits during peak <br />flow conditions. <br />Project Trigger: <br />NPDES permit compliance for total suspended solids (TSS): Dry weather maximum <br />month flow in excess of 49 mgd. Also, provide higher quality effluent so that reuse <br />options can be developed. Continue to monitor the MWMC NPDES permit renewal <br />timing and requirements. <br />Improvement <br />SDC Eligibility: <br />41.6% <br />Estimated Project Cost <br />: $16,500,000 <br />Estimated Cash Flow: <br />FY 22-23 = $1,500,000; FY 23-24 = $6,000,000; FY 24-25 = $8,800,000; <br /> <br />FY 25-26 = $200,000 <br />Prior2018-19 <br /> Expenditure/Category:YearsEst. Act.2019-202020-212021-222022-232023-24Total <br /> Design/Construction$0$0$0$0$0$3,500,000$8,500,000$12,000,000 <br /> Other$0$0$0$0$0$0$0$0 <br />Total Cost$0$0$0$0$0$3,500,000$8,500,000$12,000,000 <br />Page 60 FY 19-20 BUDGET AND CIP <br />- ¸ ΐΒǾ ΑΏΐΘǾ 7®±ª 3¤²²¨® ȟ )³¤¬ Β# <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.