Laserfiche WebLink
and is consistent with city design standards and master plans. The proposed alley vacation will <br />not have a significant effect on the surrounding transportation systems. Public Works staff <br />supports the right of way vacation from the perspective of providing adequate transportation <br />facilities and services. <br /> <br />The applicant has been issued a permit Privately Engineered Public Improvement (PEPI <br />#370018) with approved plans addressing the issue of wastewater service to the existing <br />buildings and stormwater treatment for the future development. Current wastewater service <br />located within the proposed vacated alley will be routed east via private wastewater lines to <br />the 12-inch sewer line within Pearl Street. The PEPI permit provides for facilities designed to <br />meet the City of Eugene development standards for both the private stormwater as well as city <br />sewer connections. The applicant is providing an extension of the wastewater service and <br />stormwater facilities in an orderly and efficient manner and Public Works staff supports the <br />right of way vacation from the perspective of providing adequate wastewater and stormwater <br />facilities. <br /> <br />Conclusion: <br />The applicant’s requested right-of-way vacation is in the public interest, based on the above <br />facts and the terms of the ordinance. <br /> <br /> <br />