Laserfiche WebLink
MovingAhead Spring 2019 Outreach Summary 3 <br />Draft Packages <br />The five draft packages offered for comment were based on community feedback from the previous <br />round of outreach and on findings from the Alternatives Analysis. <br />Investment <br />Package Highway 99 River Road <br />30th <br />Avenue to <br />LCC <br />Coburg <br />Road <br />MLK, Junior <br />Boulevard <br />Enhanced <br />Corridor Package <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Package A Enhanced <br />Corridor EmX No-build No-build No-build <br />Package B Enhanced <br />Corridor EmX No-build Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Package C Enhanced <br />Corridor EmX Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />EmX Package EmX EmX EmX EmX Enhanced <br />Corridor <br /> <br /> The Enhanced Corridor package represented the second smallest level of capital investment and <br />the lowest operating cost. <br /> Packages A, B, and C represented increasing levels of investment. <br /> The EmX package represented the largest investment (all EmX except for MLK, Jr. Blvd., where <br />EmX was not considered). <br />Each of the packages was described to participants in terms of cost, ridership, service level and other <br />criteria from the 2018 Alternatives Analysis. <br /> <br />July 15, 2019, Joint Work Session – Item1