Laserfiche WebLink
MovingAhead Spring 2019 Outreach Summary 25 <br />The results are similar to those from individual feedback (collected at both the in-person and online <br />open houses) — except that Capital Cost was chosen less frequently, and Bike/Pedestrian Safety was <br />chosen with only slightly more frequency than Ridership Increase. <br />Participant-built packages <br />Participants could build their own package, choosing one of three options — No-build, Enhanced <br />Corridor and EmX Corridor — for each of the five MovingAhead corridors. <br />The exercise was not required; 227 of the 291 participants completed it. They assembled 56 complete, <br />discrete packages. Only about half were replicated by more than one participant — and only seven <br />packages were replicated by 10 or more builders. The leading package by far was EmX on all routes, <br />except Enhanced Corridor on MLK, Jr. Blvd. — identical to the EmX draft package. The closest runner-up <br />was No-build on all corridors. The 56 built packages are as follows. <br />Highway 99 River Road 30th <br />Avenue/LCC <br />Coburg <br />Road <br />Martin Luther <br />King, Jr. Blvd. <br />Number who <br />chose <br />EmX-Corridor EmX-Corridor EmX-Corridor EmX- <br />Corridor <br />Enhanced-Corridor 44 <br />No-build No-build No-build No-build No-build 20 <br />Enhanced- <br />Corridor <br />Enhanced- <br />Corridor <br />Enhanced- <br />Corridor <br />Enhanced- <br />Corridor <br />Enhanced-Corridor 16 <br />Enhanced- <br />Corridor <br />EmX-Corridor Enhanced- <br />Corridor <br />EmX- <br />Corridor <br />Enhanced-Corridor 15 <br />Enhanced- <br />Corridor <br />EmX-Corridor Enhanced- <br />Corridor <br />Enhanced- <br />Corridor <br />Enhanced-Corridor 11 <br />EmX-Corridor EmX-Corridor Enhanced- <br />Corridor <br />Enhanced- <br />Corridor <br />Enhanced-Corridor 10 <br />EmX-Corridor EmX-Corridor Enhanced- <br />Corridor <br />EmX- <br />Corridor <br />Enhanced-Corridor 10 <br />Enhanced- <br />Corridor <br />EmX-Corridor EmX-Corridor EmX- <br />Corridor <br />Enhanced-Corridor 7 <br />EmX-Corridor Enhanced- <br />Corridor <br />Enhanced- <br />Corridor <br />Enhanced- <br />Corridor <br />Enhanced-Corridor 6 <br />Enhanced- <br />Corridor <br />Enhanced- <br />Corridor <br />No-build Enhanced- <br />Corridor <br />No-build 5 <br />Enhanced- <br />Corridor <br />EmX-Corridor EmX-Corridor Enhanced- <br />Corridor <br />Enhanced-Corridor 5 <br />Enhanced- <br />Corridor <br />Enhanced- <br />Corridor <br />Enhanced- <br />Corridor <br />Enhanced- <br />Corridor <br />No-build 4 <br />EmX-Corridor Enhanced- <br />Corridor <br />EmX-Corridor EmX- <br />Corridor <br />Enhanced-Corridor 4 <br />EmX-Corridor EmX-Corridor Enhanced- <br />Corridor <br />Enhanced- <br />Corridor <br />No-build 4 <br />EmX-Corridor EmX-Corridor EmX-Corridor Enhanced- <br />Corridor <br />Enhanced-Corridor 4 <br />July 15, 2019, Joint Work Session – Item1