Laserfiche WebLink
105 <br />DOWNTOWN <br />UNIVERSITYOF OREGON <br />W I L L A M E T T E RIV <br />E <br />R <br />W 6TH AVE <br />W 7TH AVE 5 <br />W 11TH AVE <br />SKINNERBUTTEPARK <br />ALTONALTONBAKERBAKERBAKERPARK <br />AUTZENSTADIUM <br />MLK JR. BLVD <br />W CENTENNIAL BLVD <br />SPRINGFIELD <br />OA <br />K <br /> <br />S <br />T <br />P <br />E <br />A <br />R <br />L <br /> <br />S <br />T <br />C O B U R G R D <br />E 8TH AVE <br />W 6TH AVEW 6TH AVEW 6TH AVE <br />1/4 1/2 3/40 1 Mile <br />N <br />Dedicated Transit Lane <br />Business Access & Transit Lane <br />Roadway Improvements <br />No Roadway Changes <br />Existing EmX Line <br />New or Improved Stop <br />Existing Stop <br />Bicycling improvements <br />Enhanced Pedestrian Crossing <br />Bicycling <br />Walking <br />Driving & Riding <br />MAP LEGEND <br />Business Access and Transit Lanes with Multi-use Path1 <br />1 <br />Service continues into Springfield <br />without infrastructure invesments <br />Enhanced Corridor Alternative <br />Martin Luther King, Jr. Blvd. Corridor This map shows the transit, <br />bicycle, and pedestrian <br />investments included in the <br />MLK, Jr. Blvd. build alternative. <br />28 | Executive Summary: MovingAhead Alternatives Analysis ReportJuly 15, 2019, Joint Work Session – Item1