Laserfiche WebLink
<br />MovingAhead Investment Package Alternatives May 2019 <br /> Supplemental Refinement Report 3 <br />• Strong support for better transit improvements <br />• Importance of <br />o increasing transit ridership, <br />o improving bicycle and pedestrian facilities and safety, <br />o reducing transit travel time, <br />o serving disadvantage populations, and <br />o providing service to employment and residential areas <br />• Support for the build alternatives (either Enhanced Corridor or EmX) on Highway 99, 30th <br />Avenue to LCC, and Coburg Road <br />• Support for EmX on River Road <br />• Support for Enhanced Corridor on Martin Luther King, Jr. Boulevard <br />• Concerns about operating costs and traffic congestion <br />The community feedback is documented in the MovingAhead 2018 Outreach Summary (October 2018). <br />1.2.4 Investment Package Options <br />Based on community feedback and technical analysis, five investment packages were developed. Of the <br />five proposed investment packages, two packages provided low and high investment options: an all <br />Enhanced Corridor package and an all EmX package (except Martin Luther King, Jr. Boulevard had an <br />Enhanced Corridor option because an EmX option was not considered on this corridor). These two <br />packages provided “bookends” to three other options (Packages A, B, and C) which were a combination <br />of No-Build, Enhanced Corridor, and EmX alternatives. The three “mix and match” packages reflected <br />increasing levels of investment, starting from Package A with a relatively low level of investment to <br />Package C with higher investment. The proposed investment packages are shown in Table 1.2. <br />Table 1.2 Proposed Investment Packages for Community Review, Spring 2019 <br /> <br />Investment <br />Package <br />Corridor <br />Highway 99 River Road 30th Avenue <br />to LCC Coburg Road MLK, Junior <br />Boulevard <br />Enhanced Corridor <br />Package <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Package A Enhanced <br />Corridor EmX No-Build No-Build No-Build <br />Package B Enhanced <br />Corridor EmX No-Build Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Package C Enhanced <br />Corridor EmX Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />EmX Package EmX EmX EmX EmX Enhanced <br />Corridor <br /> <br />July 15, 2019, Joint Work Session – Item1