My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 7-15-19 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2019
>
07-15-19
>
Agenda Packet 7-15-19 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:50:41 PM
Creation date
7/5/2019 4:41:31 PM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Work Session
City_Council_Meeting_Date
7/15/2019
City_Council_Effective_Date
7/15/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MovingAhead Investment Package Alternatives May 2019 <br /> Supplemental Refinement Report 5 <br />• Higher ratings for investment packages with a greater level of investment (Packages B and C, <br />and EmX Package) <br />Refinements to proposed investment packages are: <br />• Enhanced Corridor and EmX investment packages remained the same. <br />• Package A was modified to address community concerns about having a lower level of <br />investment but also having investment spread across more corridors. The overall level of <br />investment in Package A was reduced by changing River Road Corridor EmX to Enhanced <br />Corridor and the number of corridors with improvements was increased by adding Enhanced <br />Corridor investment to the Coburg Road Corridor. A No-Build level of investment was retained <br />for the 30th Avenue to LCC and Martin Luther King, Jr. Boulevard Corridors. <br />• Package B was refined to address community desire to have a higher level of investment in the <br />Highway 99 Corridor. The Highway 99 Corridor Enhanced Corridor investment was increased to <br />EmX investment and investment levels in all other corridors remained the same. <br />• Package C was refined to address community desire to have a higher level of investment in the <br />Coburg Road Corridor. The Coburg Road Corridor Enhanced Corridor investment was increased <br />to EmX investment and investment levels in all other corridors remained the same. <br />The refined investment packages proposed for community review in fall 2019 are summarized in Table <br />1.3. <br />Table 1.3 Proposed Refined Investment Packages for Community Review, Fall 2019 <br /> <br />Investment <br />Package <br />Corridor <br />Highway 99 River Road 30th Avenue <br />to LCC Coburg Road MLK, Junior <br />Boulevard <br />Enhanced Corridor <br />Package <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Modified Package <br />A <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor No-Build Enhanced <br />Corridor No-Build <br />Modified Package <br />B EmX EmX No-Build Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Modified Package <br />C <br />Enhanced <br />Corridor EmX Enhanced <br />Corridor EmX Enhanced <br />Corridor <br />EmX Package EmX EmX EmX EmX Enhanced <br />Corridor <br /> <br />1.4 Next Steps <br />The next steps in the MovingAhead project are focused on local decision makers selecting a preferred <br />package of investments: <br />July 15, 2019, Joint Work Session – Item1
The URL can be used to link to this page
Your browser does not support the video tag.