My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 7-15-19 Work Session
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2019
>
07-15-19
>
Agenda Packet 7-15-19 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:50:41 PM
Creation date
7/5/2019 4:41:31 PM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Work Session
City_Council_Meeting_Date
7/15/2019
City_Council_Effective_Date
7/15/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> July 15, 2019, Joint Work Session – Item 1 <br /> <br />Proposed Investment Packages as Recommended by Oversight Committee and LTD <br />Strategic Planning Committee <br />Package Highway 99 River Road 30th Ave to <br />LCC Coburg Road MLK, Jr Blvd <br />Enhanced <br />Corridor EC EC EC EC EC <br />Original <br />Package C EC EmX EC EC EC <br />Modified <br />Package C EC EmX EC EmX EC <br />EmX EmX EmX EmX EmX EC The formal decision-making process by the Eugene City Council and LTD Board of Directors is planned for fall 2019. At that time, the Eugene City Council and LTD Board of Directors will hold a joint public hearing, deliberate, and will be asked to select a preferred package of investments for people walking, biking, using mobility devices, and using transit. The decision by Eugene City Council and LTD Board of Directors will select a preferred package of transportation investments (e.g., EmX, Enhanced Corridor, or No-Build alternatives) to be completed within 10 years. The selected package will be advanced to the next MovingAhead project phase, which will include seeking design and construction funding, preparing final NEPA environmental reviews, and initiating the Federal Transit Administration project development process for qualifying projects. This future phase will also include design refinements, which will be based on feedback received during the public review period this year and subsequent outreach to stakekholders along the corridors where projects are advanced. The selected package will include designs that reflect community priorities and enable the City and LTD to make smaller, strategic investments such as safer pedestrian crossings within the larger corridor visions. This type of incremental implementation allows investments today that address the community’s needs without precluding the ability to later construct a larger project. <br />PREVIOUS COUNCIL DIRECTION The MovingAhead project is in alignment and consistent with policy direction contained in Envision Eugene, the Eugene 2035 Transportation System Plan, Eugene’s Climate Recovery Ordinance, LTD’s Long-Range Transit Plan, and the Regional Transportation Plan. Additionally, the project structure has embraced a triple bottom line approach. This approach is part of the NEPA-required technical analysis. It is further reinforced in the composition of the Sounding Board and the evaluation criteria used to analyze each corridor alternative.
The URL can be used to link to this page
Your browser does not support the video tag.