My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2: PH on Resolution Adopting Amended SDC Methodology and Rates
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 01/16/07 Public Hearing
>
Item 2: PH on Resolution Adopting Amended SDC Methodology and Rates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:22:42 PM
Creation date
1/11/2007 11:45:29 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
1/16/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />In addition, City Council adopted Growth Management Study (GMS) policies to provide <br />direction for provision of infrastructure services related to new development: <br /> <br />GMS Policv #14: Development shall be required to pay the full cost of extending <br />infrastructure and services, except that the City will examine ways to subsidize the costs <br />of providing infrastructure or offer other incentives that support higher-density, in-fill, <br />mixed-use, and redevelopment. <br /> <br />1.2 SDC Charges <br /> <br />The SDCs and the associated administrative charges and credits imposed by Eugene <br />Code, 1971 sections 7.700 through 7.740 shall be determined as set forth in these <br />methodologies. The current rates of charge for each system are listed in the adopted <br />SDC fee schedule in Appendix F. The methods of calculating administrative charges are <br />noted within section 2.3.1 Administrative Costs and the methods of calculating credits <br />are noted within section 7.2 Credits. <br /> <br />2.0 Exemptions and General Approach <br /> <br />This section outlines the general approach taken in calculating the City's development charges <br />and in determining and specifying appropriate expenditures of SDC revenue. For the purposes <br />of this document, the definitions in the Eugene Code, 1971 shall apply unless expressly <br />provided to the contrary. Appendix A contains definitions of words and phrases, which are used <br />throughout these methodologies. <br /> <br />2.1 Assignment of Use Classifications <br /> <br />Developments will be assigned use classifications that best reflect the developments' <br />use per system (transportation, wastewater, stormwater, parks) as set forth in these <br />methodologies. In the case of multiple uses that are proposed and/or exist within one <br />development, as determined by Staff, more than one use classification may be assigned <br />by which the SDC fees and credits will be calculated. <br /> <br />2.2 Exemptions <br /> <br />To simplify the administration of the SDC, no development involving then-existing <br />improvements on a site will be deemed to increas,e usage of or create the need for <br />additional capital improvements until one of the following occurs: <br /> <br />. For property improved with a residential use (e.g. single family dwelling, duplex <br />or other multiple-family use), when: <br /> <br />~ an additional dwelling unit is created, <br /> <br />~ there is an increase in square footage of living area, or <br /> <br />~ all or part of any structure on the site is changed to a use not permitted <br />outright in an any residential zoning distr,ict as noted in Eugene Code, <br />1971 section 9.2740. <br /> <br />City of Eugene sec Methodologies <br />
The URL can be used to link to this page
Your browser does not support the video tag.