Laserfiche WebLink
Ordinance Exhibit D <br />DOWNTOWN RIVERFRONT <br />LAND USE COMPONENTS <br />CA 19-1, RA 19-1, Z 19-5, WG 19-3, ST 19-3, and SDR 19-2 April 19, 2019 <br />(e) Where the facility will provide treatment for runoff from the public <br />right-of-way and the City will be maintaining the facility. <br />The development is proposing new City maintained stormwater flood control and water quality <br />facilities. The development does not contain lands identified in the City's acknowledged Goal 5 <br />inventory. The proposed stormwater piping systems are located in proposed public rights of way. <br />Stormwater easements are proposed on Lots 10 and 12 (see Exhibit 13.2, sheets T1.1 and T1.2) for <br />water quality facilities outside the public right of way. Public drainage facilities are extended adjoining <br />undeveloped property through proposed public rights of way. Public Utility Easements are proposed <br />for stormwater laterals to the rear of all future townhome lots. Stormwater services are provided to <br />each lot by right-of-way and easements. All proposed easements will be dedicated on the final plat. <br />Other easements may be necessary through the more detailed design and public improvement <br />permitting process. Any additional easements will be dedicated separately for the final plat, as <br />necessary and determined through subsequent permitting process prior to construction. Therefore, <br />this standard is met. <br />EC 9.6797 Stormwater Operation and Maintenance. <br />All proposed public stormwater facilities will be operated and maintained in accordance with the <br />Eugene Code requirements and the Stormwater Management Manual. All proposed facilities will be <br />publicly owned and maintained. Runoff from the right-of-way will be designed and constructed <br />through the public improvement process, located in public rights-of-way and easements, and selected <br />from the list of facilities in the Stormwater Management Manual, as required by these standards. <br />(i) The proposed subdivision complies with other applicable development <br />standards for features explicitly included in the application. <br />The tentative subdivision creates 17 lots to accommodate a mixture of uses as envisioned in the <br />updated concept for redevelopment of the downtown riverfront, and the S -DR zone. Subsequent final <br />plats will likely create additional smaller townhome lots, which are depicted on the tentative <br />subdivision plans for reference. <br />The future development that will occur on lots created through this process is not included as part of <br />the tentative subdivision. All buildings will be developed consistent with the development and design <br />standards of the S -DR zone and corresponding sub -districts and overlays, as applicable. Table 1, <br />included under criterion (1)(a) above, provides cross reference to the S -DR zone sub -districts and <br />height regulating plan applicable to each lot. The overlay areas are also more precisely located and <br />shown on the tentative subdivision plat. Applicable overlay standards will be applied to development <br />proposals during the building permit process. <br />An approved adjustment to a standard pursuant to the provisions beginning at EC <br />9.8015 of this land use code constitutes compliance with the standard. <br />There are no adjustments requested. This section does not apply. <br />(11) The proposal complies with the Traffic Impact Analysis Review provisions of <br />EC 9.8650 through 9.8680 where applicable. <br />The proposed subdivision is entirely located within the Downtown Plan boundary. To facilitate <br />development within the Downtown Plan area, the City provides an exemption to the Traffic Impact <br />Analysis (TIA) application review that is required elsewhere in the community. The downtown <br />City of Eugene FINAL SUBMITTAL 80 <br />