My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 1: FY08-FY13 Draft Capital Improvement Program
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 02/20/07 Public Hearing
>
Item 1: FY08-FY13 Draft Capital Improvement Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:15:53 PM
Creation date
2/15/2007 8:23:47 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment E <br />Public Works <br />Engineering <br />City of Eugene <br />M <br />858 Pearl Street <br />EMORANDUM <br />Eugene, Oregon <br />97401 <br />(541) 682-5291 <br />(541) 682-5032 FAX <br /> Date: <br />February 1, 2006 <br /> To: <br />Chair Demboski and Budget Committee <br />From: <br />Mark Schoening, 682-5243 <br /> City Engineer, Public Works Engineering <br />Subject: CAPITAL IMPROVEMENT PROGRAM – PROJECT DEVELOPMENT FOR THE <br />EXTENSION OF ROOSEVELT BOULEVARD <br />This memo is in response to Council direction to the City Manager from the December 13, 2006 <br />Council work session. The Council passed a motion directing the City Manager to: <br />Bring an amendment to the Capital Improvement Plan for project development for the extension <br />of Roosevelt Boulevard to the City Council as it considers the Capital Improvement Plan and to <br />bring information regarding the impact the project would have on wetlands at that time. <br />The extension of Roosevelt Boulevard would begin at the current terminus of Roosevelt Boulevard at <br />Terry Street and extend northwesterly through the Royal mixed-use center and end at the intersection <br />of Legacy Street and Avalon Street (see Attachment 1). The portion of the project within the Royal <br />Avenue mixed-use center is included in the . The entire project is included as <br />Royal Site Specific Plan <br />two separate projects – Future Collector H (north of Royal Avenue) and Future Collector F (south of <br />Royal Avenue) in the Regional Transportation Plan and Transplan. <br />The total length of the project is 7,200 feet. The right of way width would vary from 65 feet to 75 feet. <br /> The typical cross section proposed as part of the is shown as Attachment 2. <br />Royal Site Specific Plan <br />The total area of right of way for the project is approximately 11.5 acres. Approximately 9.54 acres of <br />the total 11.5 acres are wetlands. The following wetland information is illustrated on Attachment 1: <br />West Eugene Wetlands <br />Hydric soils (one characteristic of wetlands) identified by the Natural Resources Conservation <br />Service <br />Wetlands qualitatively identified as part of the Local Wetland Inventory <br />Wetlands quantitatively identified as part of the Legacy Interceptor Extension Project (same <br />alignment as the Roosevelt Boulevard extension) <br />Wetlands quantitatively identified as part of a proposed residential development immediately <br />south of Avalon Street. <br />The estimated cost of project development for the extension of Roosevelt Boulevard is $551,000. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.