Laserfiche WebLink
<br />Methodology' Element Three: Develop SDC Schedule <br /> <br />Unit costs for each capacity parameter are determined by dividing the adjusted cost basis by <br />the projected growth capacity requirements. The unit costs are then multiplied by the <br />estimated capacity requirements of different types of users, as determined from industry <br />reference data. Figure 4 illustrates this. process. . <br /> <br />FIGURE 4-SDC SCHEDULE DEVELOPMENT <br /> <br />. <br /> <br />ysing industry reference data f()rch~ging SDCs is consistent with the approach MWMC : <br />has previously used to charge SDCs. This type of approach.uses flow and strength <br />assumptions that are consistent with the system capacity parameters described previously. <br /> <br />Unit Costs <br /> <br /> <br />x <br /> <br /> <br />x <br /> <br /> <br />x <br /> <br /> <br />x <br /> <br />Capacity <br />Requirement / <br /> <br />SDC/Unit <br /> <br /> <br /> <br /> <br /> <br /> <br />For e'.'ample, average flow is defined as dry season maximum month flow. This capacity <br />measure is used in estimating user capacity requirements. The peak-to-average flow ratio <br />reflects the system planning assumptions. The flow and strength assumptions for various <br />land uses (development types) are presented in Appendix D..H information for a particular <br />development is not found in AppencUx D, the SDC will be formulated using average data of' <br />like or similar development as determined by the City Engineer. . <br /> <br />Methodology Element Four: Calculate Revenue Offsets and Credits <br /> <br />To comply with Oregon SDC law, the SDC methodology must ensure that future system users <br />contribute no more than an II equitable share" of the capital costs of existing' facilities. Before <br />real property.is developed, it may have been subject to taxes that supported capital funding of <br />some of the Regional Wastewater System. Mer a development connects to the system, it will <br />pay rates and, possibly taxes as. well, that may also support some level of capital funding. The <br />SDC methodology. therefore considers past and future payments to be made' by new <br />developments, which'may partially fund the same facilities for which the:SDCs were paid. <br />