My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5: Resolution Adopting Amended SDC Methodologies and Rates
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 02/20/07 Public Hearing
>
Item 5: Resolution Adopting Amended SDC Methodologies and Rates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:53:11 PM
Creation date
2/15/2007 8:30:23 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Appendix A <br /> <br />Definitions of General Terms and Use Codes <br /> <br />Administrative Charge: The amount charged to each development to cover the cost of <br />developing the methodologies, providing an annual accounting of system development charge <br />expenditures, implementation and operational costs associated with the SDC program. <br /> <br />Accessory Dwelling Unit: As used in the determination of SDC rates, an accessory dwelling <br />unit is any additional residential dwelling unit added to a development site for which a secondary <br />dwelling unit is allowed per local code and typically has the following components: <br />· separate ingress I egress <br />· living area <br />· kitchen facilities including sink (in addition to bathroom sink), refrigerator, or stove <br />· separate bathroom <br />Note that while inclusion of all of the above would constitute the potential impact of an additional <br />dwelling unit, exclusion of any item(s) listed above would not preclude such an impact for the <br />purposes of calculating SDC fees. <br /> <br />Acquisition Costs: The indirect or direct amount expended to procure use, possession, rights, <br />or title as related to the construction of public improvements. This cost may be determined by <br />current market experience, or other reasonable and prudent methods approved by the City <br />Engineer. <br /> <br />Assessable Costs: The amount of capital improvement costs which are collected through the <br />City's local improvement assessment program as established in City code. This cost has been <br />removed from the total cost of capital improvements in determining the system-specific SDC. <br /> <br />Average Cost Determination: <br /> <br />· The average cost of inspecting and installing connections with the wastewater facilities <br />and with the stormwater facilities, which are not part of the SDC as defined in E.C. <br />7.010, is the connection permit fee established by the City. <br /> <br />· If an applicant to connect to a wastewater or stormwater facility would result in <br />extraordinary cost of inspecting and installing the connection, nothing in this definition <br />shall prevent the City from requiring the applicant pay such costs. The extraordinary <br />costs may be paid by the applicant in installments as part of the SDC. <br /> <br />Average Flow: The typical average daily flow of development, by type of land use. For <br />purposes of calculating the Metropolitan Wastewater Management Commission SDC, this flow <br />is expressed in terms of a unit of development. <br /> <br />BOD: Biochemical Oxygen Dema-nd. The quantity of oxygen utilized in the biochemical <br />oxidation of organic matter. <br /> <br />Change of Use of a Building in its Entirety: An existing building proposed to redevelop in <br />manner that changes all existing use classifications as determined by staff. <br /> <br />City of Eugene SDC Methodologies <br /> <br />Definitions~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.