My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5: Resolution Adopting Amended SDC Methodologies and Rates
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 02/20/07 Public Hearing
>
Item 5: Resolution Adopting Amended SDC Methodologies and Rates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:53:11 PM
Creation date
2/15/2007 8:30:23 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Appendix C1 <br />Local Wastewater System Charge Detail <br /> <br />1.0 Local Wastewater System Methodology <br />1.1 Local Wastewater SDC Formula <br /> <br />The general methodology used to develop SDCs includes the following four steps: <br /> <br />· Determine value of growth-related capacity <br />· Define system capacity <br />· Calculate unit cost of growth-related capacity <br />· I Develop SDC rate schedule <br /> <br />Each step is discussed below and related information is displayed in Table 6. <br /> <br />1.1.1 Step 1 - Determine Value of Growth-Related Capacity <br />(In 1998 dollars -- see current values in Table 6) <br /> <br />In Eugene, as in most communities, a portion of the capacity needed to serve <br />new development will be met through a combination of existing available system <br />capacity, and additional capacity added by planned system improvements. The <br />reimbursement fee is intended to recover the costs associated with the growth- <br />related (or available) capacity in the existing system, and the improvement fee is <br />based on the costs of capacity-increasing future improvements needed to meet <br />the demands of growth. <br /> <br />Reimbursement Fee <br /> <br />Calculation of the reimbursement fee begins with a review of utility fixed asset <br />records to determine the value of the existing local wastewater system. The <br />system value is based on Replacement Cost New which is a method that <br />involves assigning asset values on the basis of what it would cost in current <br />dollars to construct an equivalent set of infrastructure assets subject to current <br />market conditions, regulatory requirements, and technological advances. The <br />total value of the existing local wastewater system, including gravity lines (net of <br />assessments), force mains (or pressure lines), and pump stations was estimated <br />to be $96.1 million. Approximately $8.9 million of assets were funded from <br />grants. Like assessments, grant funds are deducted from the system value in <br />the SDC analysis because general system users did not fund these assets. Net <br />of grants, the total value of the existing system is approximately $87.2 million. <br /> <br />Because reimbursement fees are intended to recover the value of the system's <br />unused or available capacity, the total equity in the system is split between <br />existing customers and new development based on the estimated proportionate <br />use of capacity. The reimbursement cost basis is equal to the system equity <br />associated with the capacity available to serve new customers. Approximately <br />520/0 of the existing system is available to meet the demands of new customers. <br />Therefore, the value of available (or growth-related) capacity in the existing <br />system is $45.3 million (net of grants). <br /> <br />City of Eugene SDC Methodologies Wastewater, <br />
The URL can be used to link to this page
Your browser does not support the video tag.