My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: Delta Sand and Gravel Metro Plan Amendment
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 02/21/07 Work Session
>
Item B: Delta Sand and Gravel Metro Plan Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:12:36 PM
Creation date
2/15/2007 8:51:07 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/21/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Exhibit C <br /> <br />Ordinance No. PA 1238 <br />Metro Plan Amendment and Rezone <br />Delta Property Company <br /> <br />Conditions Necessary to Minimi.ze Conflicts are Req.uired to Become Part of Any <br />Operation Plan Reviewed or Approved under LC 16.217 <br /> <br />NOISE mitiaatlon <br /> <br />All Zones: <br /> <br />1. Begin first and second lift mining operations no earlier than 7:00AM and end <br />mining operations no later than 1 OPM~ <br /> <br />2. Retain the administrative controls of restricting the location of mining equipment <br />to reduce mining noise. <br /> <br />3. Take advantage of the screening. effect provided when the equipment is below <br />grade. <br /> <br />4. First and second lift mining operations may be conducted separately or <br />simultaneously. <br /> <br />Zone 1 <br />5. No additional restrictions beyond adhering to the time limit above, conduct <br />normal mining procedures for all three lifts. <br /> <br />Zone 2 <br />6. Excavator removes a second lift of 18' of material by digging from the base of the <br />second lift (digging from below) when the excavator is within 800'ofthewestern <br />boundary of the Expansion Area. <br /> <br />7. If the front end loader is operating at the same time as the excavator, the <br />excavator must be 1500' or more away from any point on the western boundary <br />of the Expansion Area that is within 800' of the front end loader. <br /> <br />Zone 3 <br />Same restrictions as Zone 2 plus the following additional controls: <br /> <br />8. After overburden is removed, the front end loader removes a first lift of 13' of <br />material by digging from the base of the first I.ift when the front end loader is <br />within 550' of the western boundary of the Expansion area. <br /> <br />Ordinance No. PA 1238 - Exhibit C Conditions <br /> <br />Delta Sand & Gravel <br /> <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.