My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-19-05
COE
>
City of Eugene
>
Administrative Orders
>
2019
>
Admin Order 58-19-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 2:26:28 PM
Creation date
9/9/2019 2:25:32 PM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Segment Type Extent* Length** Description <br />Riverbank Path Riverbank path system nea r Beltline Road w ith a <br />System co n nection to Santa Clara Pa r k. <br />C12 Shared -Use Moon 4,500 If This trail segment would connect Moon Mountain Pa r k to <br />Trail Mountain to the Wil l amette River and proposed riverside multi-use <br />Willamette path. Trail would pass under 1-5 through existing underpass. <br />River Acquisition of land or access easements would be required. <br />C13 Shared-Use Between 1,800 If Connector trail between the proposed ridgeline trail <br />Trail proposed trail corridor Cl and proposed trail corridor C2. <br />co r ridors Cl <br />and C2 <br />*Trail locations and extent may vary based on availability of land and additional site analysis. <br />**Lengths are approximate and will vary depending on final alignment. Length shown is in linear feet (If). <br />Figure 5-4: Existing and Proposed Trails by Length <br />Miles of Trail <br />70 <br />60 57 .8 <br />50 .6 <br />50 <br />40 <br />30 24.2 <br />20 <br />10 <br />0 <br />Existing Proposed Total Future <br />■ Pedestrian ■ Shared-Use ■ Running <br />Page 32 Eugene Trails Plan -2018
The URL can be used to link to this page
Your browser does not support the video tag.