My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 10-21-19 Joint Public Hearing with LTD
COE
>
City of Eugene
>
Public Meetings
>
CMO
>
2019
>
10-21-19
>
Agenda Packet 10-21-19 Joint Public Hearing with LTD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 5:22:54 PM
Creation date
10/10/2019 5:22:40 PM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Meeting
City_Council_Meeting_Date
10/21/2019
City_Council_Effective_Date
10/21/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />October 21, 2019, Public Hearing – Item 1 <br /> <br /> <br /> <br />AGENDA ITEM SUMMARY <br /> Public Hearing: MovingAhead Meeting Date: October 21, 2019 Agenda Item Number: 1 Department: Public Works, Planning and Development Staff Contact: Chris Henry <br />www.eugene-or.gov Contact Telephone Number: 541-682-8472 <br /> <br />ISSUE STATEMENT The City of Eugene and Lane Transit District, with the help of other regional partners, are collaborating on the MovingAhead project to determine how best to invest in the main corridors that connect neighborhoods, shopping areas and places of employment. Building on years of long-range planning in the community, MovingAhead is an implementation effort that will result in prioritized investments in transit, walking and biking projects in each of five corridors that are identified in Envision Eugene, LTD’s Long-Range Transit Plan, and the Eugene 2035 Transportation System Plan. This public hearing is an opportunity for the Eugene City Council and LTD Board of Directors to hear testimony about proposed corridor investment packages affecting five of Eugene’s major transportation routes. An open house immediately precedes the public hearing, from 5:00 p.m. to 7:00 p.m. in the lobby outside Harris Hall. <br />BACKGROUND In 2015, the MovingAhead project kicked off with public workshops held along the corridors under consideration. At each workshop, local residents were asked to design their ideal street to accommodate people walking, biking, using mobility devices, driving and using transit. After gathering that public input, the project team developed conceptual designs on which the formal technical analysis was conducted. These conceptual designs include Enhanced Corridor and Emerald Express alternatives as well as a No-Build alternative (descriptions may be found in the Executive Summary, Attachment A). Comprehensive bus rapid transit—known as EmX locally—is a recognizable transit service in the community. A No-Build alternative assumes maintaining the current service on a street in the short term (5-10 years). On a continuum of transit service investments, the Enhanced Corridor alternatives fall between the other two alternatives, thereby providing improved transit service and reliability through less intensive infrastructure investments compared to EmX. These may include traffic signal prioritization for buses or additional lanes near intersections to create a
The URL can be used to link to this page
Your browser does not support the video tag.