Laserfiche WebLink
5 feet <br />5 <br />f <br />e <br />e <br />t <br /> <br />o <br />r <br /> <br />m <br />o <br />r <br />e <br />Grade <br />Grade <br />5 feetHe <br />i <br />g <br />h <br />t <br /> <br />o <br />f <br /> <br />B <br />u <br />i <br />l <br />d <br />i <br />n <br />g <br /> <br />n <br />o <br />t <br /> <br />to <br /> <br />e <br />x <br />c <br />e <br />e <br />d <br /> <br />2 <br />5 <br /> <br />f <br />e <br />e <br />t <br />Setback shall slope at a rate of <br />10 inches vertically for every <br />12 inches horizontally <br />Se <br />t <br />b <br />a <br />c <br />k <br /> <br /> <br />b <br />e <br />g <br />i <br />n <br />s <br /> <br />t <br />o <br /> <br />s <br />l <br />o <br />p <br />e <br /> <br />a <br />t <br /> <br />18 <br /> <br />f <br />e <br />e <br />t <br /> <br />a <br />b <br />o <br />v <br />e <br /> <br />n <br />i <br />s <br />h <br /> <br />g <br />r <br />a <br />d <br />e <br />Pr <br />o <br />p <br />e <br />r <br />t <br />y <br /> <br />L <br />i <br />n <br />e <br />10 <br />12 <br />Highest roof point not to exceed 25 feet <br />5 feet <br />(10 feet for ag lots) <br />20 feet 20’ or more from lot line, sloped setback does not apply <br />20’ or more from lot line, sloped setback does not apply <br />Figure <br />9.2751(17)(a)3.b.(2)(A) <br />Building Height Calculation & Sloped Setback <br />for Sloped Lots <br />Exhibit A to Attachment B <br />January 21, 2020, Work Session - Item 1