My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 1-21-20 Public Hearing
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2020
>
1-21-20
>
Agenda Packet 1-21-20 Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2020 6:03:45 PM
Creation date
1/10/2020 5:59:07 PM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Meeting
City_Council_Meeting_Date
1/21/2020
City_Council_Effective_Date
1/21/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Table E-2 <br />Existing and Planned Park Acreage, Trails, and Recreation Facilities <br />Existing1 Planned Additions2 Future <br />Type Units Total <br />Acquired3 Developed Acquisition Developed Total <br />Acquired <br />Total <br />Developed <br />Parks Acres <br />Neighborhood 263.7 120.1 33.5 28.8 297.2 148.9 <br />Community 478.0 142.0 32.6 38.1 510.6 180.1 <br />Metropolitan 952.3 207.2 6.5 11.3 958.8 218.5 <br />Natural Area 1,618.6 0.0 260.0 0.0 1,878.6 0.0 <br />Urban Plazas 1.5 1.5 0.5 0.5 2.0 2.0 <br />Linear Parks 272.1 0.0 0.0 0.0 272.1 0.0 <br />Total Parks 3,586.2 470.8 333.1 78.6 3,919.4 549.4 <br />Recreation Trails4 Miles 39.3 39.3 21.1 23.2 60.4 62.4 <br />Special Facilities Sq. Ft. <br />Community Centers 69,755 89,720 159,475 <br />Pools 67,491 32,080 99,571 <br />Recreation Amenities Number <br />Dog Parks 4 3 7 <br />Community Gardens 7 2 9 <br />Botanical Gardens5 5 0 5 <br />Fields 44 16 60 <br />Spray Play 4 3 7 <br />1 City owned only. <br />2 Additions based only on projects Included in Project Plan only; other projects from System Plan are not included. <br />3 Acreage for existing Metropolitan and Natural Area parks exclude estimated acreage associated with trails, so as not to over-state the <br />current LOS for these parks separate from trails (which are analyzed separately). <br />4 A small portion of future developed trails will be on property owned by other agencies; however, the City will incur the deve lopment <br />costs. <br />5 While the Project Plan does not include new acreage for Botanical Gardens, the current inventory is provided as it relates to calculation <br />of LOS for the reimbursement fee. <br />January 21, 2020, Public Hearing – Item 1Page 103
The URL can be used to link to this page
Your browser does not support the video tag.