Laserfiche WebLink
Preferred Timeline <br />Water Storage Improvements Eugene Water & Electric Board <br />•7.5 MG E. 40th <br />Ave Tank and <br />New 36" <br />Transmission <br />Main <br />2023 <br />•College Hill Out <br />of Service <br />2023 <br />•7.5 MG College <br />Hill Tank In <br />Service <br />2025 <br />•7.5 MG Hawkins <br />Tank In Service <br />2027 <br />•7.5 MG E. 40th <br />Ave Tank In <br />Service <br />2029 <br />•7.5 MG Hawkins <br />Tank In Service <br />2031 <br />•7.5 MG Tank at <br />Oak Hill, Santa <br />Clara or College <br />Hill <br />2033